6.6 Installation steps
1. Select the position of the pile, configure the power and the wall surface
to be applied. Open the back cover and install the AC power cord.
L1-L2
→
(Voltage : 208Vac or 240Vac)
L1(Red)
GND (Yellow green)
L2(White)
GND
L1
L2
5-5
8AWG
AC wire
specification
Assemble the back hanger.
1. Use M4 x 2 screws which are numbered 1 to lock. (Fig. 1)
2. Use STP5-32 x 4 expansion screws which are numbered 2, and instal the wall mount
shelf to the mounting wall. (Fig. 1)
3. Fig. 2 showns the installion of the wall bracket. The surroundings around the wall bracket
need to be kept at least 100mm away from the wall bracket.
100
100
100
100
100
200
3
2
• A device employing pressure terminal connectors for field wiring connections shall be provided with
instructions specifying a range of values or a nominal value of tightening torque to be applied to the
clamping screws of the terminal connectors.
• Use No. 8 AWG , 75°C copper wire and 17.7 lb-in (2.0 N-m) Torque force when connecting to I/P Terminal
Block.
2
2
1
2
2
1
(Fig. 1)
(Fig. 2)
9