background image

WWW.PHENIXLIGHTING.COM

WIRING

PARALLELABLE 184804 FOR 0-10V DIMMABLE EMERGENCY LIGHTING SYSTEM

8/14

 

                              4000W @ 277V

 

LED Test Switch

485

RS

232

RS

ON

Circuit Breaker (Optional)

OFF

0-10V DIMMER

ON

Dim in

Dim out

Synchronous Port

GND

L

N

GND

L

L

+

-

+

-

-

+

RX

TX

GND

L3

L 2

L 1

N-OUT L-OUT

N-OUT 

Unswitched 

Switched 

Unswitched 

Switched 

485

RS

232

RS

-

+

N-OUT L-OUT

LED Test Switch

485

RS

232

RS

ON

Circuit Breaker (Optional)

OFF

0-10V DIMMER

ON

Dim in

Dim out

Synchronous Port

GND

L

N

GND

L

L

+

-

+

-

-

+

RX

TX

GND

L3

L 2

L 1

N-OUT L-OUT

N-OUT 

Unswitched 

Switched 

Unswitched 

Switched 

485

RS

232

RS

-

+

N-OUT L-OUT

2

5

LED Test Switch

485

RS

232

RS

ON

Circuit Breaker (Optional)

OFF

0-10V DIMMER

ON

Dim in

Dim out

Synchronous Port

GND

L

N

GND

L

L

+

-

+

-

-

+

RX

TX

GND

L3

L 2

L 1

N-OUT L-OUT

N-OUT 

Unswitched 

Switched 

Unswitched 

Switched 

485

RS

232

RS

-

+

          

  LED

 

 FLUORESCENT
INCANDESCENT
     LUMINAIRE
FOR EMERGENCY

          

  LED

 

 FLUORESCENT
INCANDESCENT
     LUMINAIRE
FOR EMERGENCY

N-OUT L-OUT

NEUTRAL

GROUND

HOT

   0-10V
DIMMER

120-277 VAC

          

  LED

 

 FLUORESCENT
INCANDESCENT
     LUMINAIRE

          

  LED

 

 FLUORESCENT
INCANDESCENT
     LUMINAIRE

BATTERY SWITCH

BATTERY SWITCH

BATTERY SWITCH

1

MAX. DIMMABLE LOAD = 2000W @ 120V
                             

ANY QUANTITY

Содержание 184804

Страница 1: ...s and screw base lamps 6 Use this product in 0 C minimum 50 C maximum ambient temperatures Ta 7 This product is suitable for use in dry or damp locations Do not use outdoors Do not mount it near gas h...

Страница 2: ...CIFICATION OF 184804 2 INSTALLING THE 184804 2 14 SURFACE MOUNTING Four 1 1 8 28 5mm knock out holes Two 1 1 8 28 5mm knock out holes 2 3 LED Test Switch Output Voltage Input 230V 50Hz 120V 60Hz 230V...

Страница 3: ...INSIDE THE LUMINAIRE CEILING GRID MOUNTING INSTALLATION WWW PHENIXLIGHTING COM 3 14 LED Test Switch...

Страница 4: ...INSIDE THE LUMINAIRE PARALLELABLE MOUNTING 1 3 INSTALLATION WWW PHENIXLIGHTING COM 4 14 1 2 3 4...

Страница 5: ...INSIDE THE LUMINAIRE PARALLELABLE MOUNTING 2 3 INSTALLATION WWW PHENIXLIGHTING COM 5 14 5 6 7 8 9 10 7 7 7...

Страница 6: ...INSIDE THE LUMINAIRE PARALLELABLE MOUNTING 3 3 INSTALLATION WWW PHENIXLIGHTING COM 6 14 1 2 3 4 5 1 2 3 4 5...

Страница 7: ...L 1 N OUT L OUT N OUT Unswitched Switched Unswitched Switched 485 RS 232 RS LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY N OUT L OUT NEUTRA...

Страница 8: ...D L N L RX TX GND L3 L 2 L 1 N OUT L OUT N OUT Unswitched Switched Unswitched Switched 485 RS 232 RS N OUT L OUT 2 5 LED Test Switch 485 RS 232 RS ON Circuit Breaker Optional OFF 0 10V DIMMER ON Dim i...

Страница 9: ...Dim in Dim out Synchronous Port GND L L N GND L N L RX TX GND L3 L 2 L 1 N OUT L OUT N OUT Unswitched Switched Unswitched Switched 485 RS 232 RS N OUT L OUT 2 5 LED Test Switch 485 RS 232 RS ON Circu...

Страница 10: ...INAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY 0 10V DIMMER 120 277 VAC LED FLUORESCENT INCANDESCENT LUMINAIRE LED Test...

Страница 11: ...ESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED Test Switch 485 RS 232 RS ON Circuit Breaker OFF 0 10V DIMM...

Страница 12: ...Unswitched Switched 485 RS 232 RS N OUT L OUT 2 5 NEUTRAL GROUND HOT LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDES...

Страница 13: ...ORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERG...

Страница 14: ...t Monthly Auto Test after 24 hours and up to 7 days after initial power on Then monthly tests will be performed every 30 days b Annual Auto test will occur every 52 weeks after initial power on Monthl...

Отзывы: