OPERATION / TESTING / MAINTENANCE

OPERATION

When AC power is applied, the LED test switch is illuminated, indicating that the batteries are being charged. 
When AC power fails, the 184804 automatically switches to emergency power, operating the lighting load at 
rated emergency power. During power failure, the LED test switch will be off. When the AC power is restored, 
the 184804 switches the system back to normal mode of operation and resumes battery charging. 
The minimum emergency operation time is 90 minutes. A short term discharge test may be conducted after 
the 184804 has been charging for 1 hour. Charge for 24 hours before conducting a long term discharge test.

TESTING AND MAINTENANCE

 

The following Periodic testing is recommended to ensure the system is working correctly.
1. Visually inspect the LED test switch (LTS) monthly. It should be illuminated when AC power is applied.
2. Conduct a 30-second discharge test by switching off the emergency breaker every month. The LTS will be 
off.
3. Conduct a 90-minute discharge test once per year. The LTS will be off during the test.

AUTO TEST

The 184804 has an Auto Test feature which saves cost by reducing the need for manual testing.
1. Initial Auto Test
When the system is connected properly and powered on (make sure the load is switched on), the 184804 will 
perform an Initial Auto Test. If any abnormal conditions exist, the LTS will blink quickly. Once the abnormal 
condition is corrected, the LTS will function correctly. The Initial Auto Test will be restarted automatically 
when the connected dimmable loads' maximum power increases.
2. Preprogrammed Scheduled Auto Test
a) The unit will conduct the first Monthly Auto Test after 24 hours and up to 7 days after initial power on. Then 
monthly tests will be performed every 30 days. 
b) Annual Auto test will occur every 52 weeks after initial power on.
- Monthly Auto Test
The Monthly Auto Test shall be executed every 30 days, and will test:
Normal to emergency transfer function, emergency, charging and discharging conditions are normal. Monthly 
test time is approximately 60 seconds.
- Annual Auto Test
Annual Auto Test will occur every 52 weeks after the initial 24 hours full charge, and will test:
Proper initial battery voltage, 90-minute emergency operation and acceptable battery voltage at the end of 
the full 90-minute test.
If the Auto Test is interrupted by a power failure, a full 90-minute Auto Test will occur again 24 hours after the 
power is restored. If the power failure causes the battery to fully discharge, the product will restart the Initial 
Auto Test and Preprogrammed Scheduled Auto Test.

MANUAL TEST

1. Press the LTS one time to simulate emergency mode for 10 seconds. 
2. Press the LTS 2 times continuously within 5 seconds to force a 60-second monthly test. After the test is 
completed, the next (30-day) monthly test will count from this date.
3. Press the LTS 3 times continuously within 5 seconds to force a 90-minute annual test. After the test is 
completed, the next (52-week) annual test will count from this date. 
4. In normal mode, press and hold the LTS for greater than 3 seconds to restart Initial Auto Test.
5. During any manual test, press and hold the LTS for greater than 3 seconds to terminate a manual test. 
The Preprogrammed Scheduled Auto Test time will not change.

LED TEST SWITCH CONDITIONS 

LTS Slow Blinking: Normal Charging
LTS On: Battery Fully Charged - Normal Condition
LTS Off: Power Failure 
LTS Gradual Change: In Testing Mode 
LTS Quickly Blinking: Abnormal Condition - Corrective Action Required

14/14

Содержание 184804

Страница 1: ...s and screw base lamps 6 Use this product in 0 C minimum 50 C maximum ambient temperatures Ta 7 This product is suitable for use in dry or damp locations Do not use outdoors Do not mount it near gas h...

Страница 2: ...CIFICATION OF 184804 2 INSTALLING THE 184804 2 14 SURFACE MOUNTING Four 1 1 8 28 5mm knock out holes Two 1 1 8 28 5mm knock out holes 2 3 LED Test Switch Output Voltage Input 230V 50Hz 120V 60Hz 230V...

Страница 3: ...INSIDE THE LUMINAIRE CEILING GRID MOUNTING INSTALLATION WWW PHENIXLIGHTING COM 3 14 LED Test Switch...

Страница 4: ...INSIDE THE LUMINAIRE PARALLELABLE MOUNTING 1 3 INSTALLATION WWW PHENIXLIGHTING COM 4 14 1 2 3 4...

Страница 5: ...INSIDE THE LUMINAIRE PARALLELABLE MOUNTING 2 3 INSTALLATION WWW PHENIXLIGHTING COM 5 14 5 6 7 8 9 10 7 7 7...

Страница 6: ...INSIDE THE LUMINAIRE PARALLELABLE MOUNTING 3 3 INSTALLATION WWW PHENIXLIGHTING COM 6 14 1 2 3 4 5 1 2 3 4 5...

Страница 7: ...L 1 N OUT L OUT N OUT Unswitched Switched Unswitched Switched 485 RS 232 RS LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY N OUT L OUT NEUTRA...

Страница 8: ...D L N L RX TX GND L3 L 2 L 1 N OUT L OUT N OUT Unswitched Switched Unswitched Switched 485 RS 232 RS N OUT L OUT 2 5 LED Test Switch 485 RS 232 RS ON Circuit Breaker Optional OFF 0 10V DIMMER ON Dim i...

Страница 9: ...Dim in Dim out Synchronous Port GND L L N GND L N L RX TX GND L3 L 2 L 1 N OUT L OUT N OUT Unswitched Switched Unswitched Switched 485 RS 232 RS N OUT L OUT 2 5 LED Test Switch 485 RS 232 RS ON Circu...

Страница 10: ...INAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY 0 10V DIMMER 120 277 VAC LED FLUORESCENT INCANDESCENT LUMINAIRE LED Test...

Страница 11: ...ESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED Test Switch 485 RS 232 RS ON Circuit Breaker OFF 0 10V DIMM...

Страница 12: ...Unswitched Switched 485 RS 232 RS N OUT L OUT 2 5 NEUTRAL GROUND HOT LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDES...

Страница 13: ...ORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERGENCY LED FLUORESCENT INCANDESCENT LUMINAIRE FOR EMERG...

Страница 14: ...t Monthly Auto Test after 24 hours and up to 7 days after initial power on Then monthly tests will be performed every 30 days b Annual Auto test will occur every 52 weeks after initial power on Monthl...