PEC Plus socketed relay kit installation guide 

 

17044800  

2010-10-26 

 

 

 

Installing the new circuit board 

1.

 

Wipe the white grease and dust from the inside of the heatsink using a clean cloth. 

2.

 

Remove the new circuit board from the bag. 

3.

 

Set the voltage selection switch to the correct voltage and place the jumpers in the correct 
position. 

4.

 

Remove the orange caps from the triacs. Avoid contaminating the white grease with dust. 

5.

 

Place the new circuit board in the enclosure. 

6.

 

Fasten the circuit board to the enclosure using the five screws. 

7.

 

Fasten the triacs to the heatsink using the screws. The triacs must be flush against the heatsink. 
Do not over tighten the screws. 

8.

 

Reconnect the wires to their correct terminals. 

9.

 

Reconnect the ribbon cable to the socket. 

10.

 

Verify all the wires are properly connected to their correct locations. 

11.

 

Switch on the power to the control and verify it operates properly. If it does not operate 
properly, check the wiring and ribbon cable connection. If the unit still will not operate properly, 
contact your dealer. 

12.

 

Fasten the cover to the enclosure using the four screws. 

 

 

 

 

Display cable 

 

Terminal blocks 

 

Actuator present pins 

 

Triacs 

4

3

2

1

3

1

2

Phone:

204-233-1400

Fax: 204-233-3252

 

Phason Inc. 

2 Terracon Place 
Winnipeg, Manitoba, Canada 
R2J 4G7

 

E-mail:

[email protected]

Web site:  www.phason.ca

 

Отзывы: