background image

4 | 

P a g e

 

 

 

Figure 3

 

– Antenna Connection 

 

Install Tip 

cell phone signal booster

 may be used to increase reception in remote areas. 

 
 

2.3 Grounding the Device 

 

 

Properly ground the system according to local electrical code. 

 

Connect  the  ground  terminal  to  the  branch  circuit  or  service  ground  conductor 
with an adequately sized conductor according to local electrical code. 

 

Ground terminal location is shown in 

Figure 4

 

Recommended Min. Ground Wire 

Max Wire Size 

Torque 

14 AWG 

6 AWG 

10.5 lb-in. 

 

Antenna Cable 

Содержание PHASE CONNECT PC4R

Страница 1: ...llation Operation Manual http www phasetechnologies com downloads REMOTE EQUIPMENT MANAGEMENT Stay informed from anywhere Intuitive web mobile portal Programmable e mail and text alerts Accepts 100 48...

Страница 2: ...of this publication or its contents may be duplicated by any means electronic or otherwise without the express written consent of Phase Technologies LLC V1 0_06012021 REMOTE EQUIPMENT MANAGEMENT 222...

Страница 3: ...that can create a potentially hazardous situation Electric shock could result in serious injury or death This device should be installed only by trained licensed and qualified personnel Follow instruc...

Страница 4: ...ESET VFD FAULT 9 3 6 4 20 MA OUTPUT CONTROL 10 3 7 REPEAT 4 20 MA INPUT SIGNAL 11 4 1 INITIALIZATION 12 4 2 DEVICE PARAMETERS 12 5 1 CREATING AN ACCOUNT 13 5 2 ACTIVATING A NEW DEVICE 13 5 3 NAVIGATIN...

Страница 5: ...portal users can monitor three inputs one analog two digital and control three outputs one analog two digital Alerts can be customized to send text and or email notifications to one or multiple contac...

Страница 6: ...Input Voltage 90 VAC 528 VAC Input Current 3 A Operating Temperature Range 10 C to 50 C 14 F to 122 F Storage Temperature 20 C to 60 C 4 F to 140 F Dimensions H x W x D 11 73 x 9 07 x 6 22 Enclosure T...

Страница 7: ...ould be mounted to a solid non flammable surface using the mounting brackets provided It should be installed in a location free from Corrosive gases or liquids Excessive vibration Airborne metallic pa...

Страница 8: ...vice Properly ground the system according to local electrical code Connect the ground terminal to the branch circuit or service ground conductor with an adequately sized conductor according to local e...

Страница 9: ...rranty Table 1 Input Power Terminal Specifications Rating Wire Size Torque Input Power L1 L2 480 V 3 A 18 6 AWG 10 5 lb in Figure 4 Input Power Terminal Locations 2 5 Cable and Wire Routing All cables...

Страница 10: ...ay 1 24 VDC or 277 VAC 12 A Normally open relay controlled via online portal COM1 Common 1 Common terminal for NC1 and NO1 terminals NC1 Normally Closed Relay 1 Normally closed relay controlled via on...

Страница 11: ...e to make sure your VFD settings are set up properly for the chosen operation 3 2 Monitor VFD Run Status To set up the device to detect when a Phase Technologies VFD is running a load connect wires as...

Страница 12: ...ge and units for the transducer being used If the value shown for 4 20 mA Input does not match a manual reading use 4 20 mA Input Offset on the web portal to calibrate Figure 7 Monitor 4 20 mA Input I...

Страница 13: ...ves have this feature Navigate to the AUX SELECT parameters in your drive to ensure it has this ability Some faults on Phase Technologies VFDs require manually cycling incoming power to reset To do th...

Страница 14: ...input The wires connected to AUX 1 and COM of the VFD are used to provide RUN STOP commands from the portal If the VFD is in AUTO mode and the proper settings are selected a RUN command will prompt t...

Страница 15: ...ucer VFD and Phase Connect as shown in Figure 12 On the portal dashboard check the box under the 4 20 mA Output that says Match Input and hit Send Commands Now both the portal and the VFD will read th...

Страница 16: ...blink when connected and be always on when unconnected 4 2 Device Parameters After device is connected parameters and their values will scroll across the display See Figure 13 and Table 4 to understa...

Страница 17: ...s you will need to click on the Activate New Device button on the View Devices page and follow the steps You will need to enter the device Serial Number and Activation Code which can be found on a sti...

Страница 18: ...evices page Devices can be viewed by clicking on them This will open the Device Dashboard for the selected device where settings can be monitored and controlled Use the Device Navigation Pane to navig...

Страница 19: ...ngs to reach or move toward their setpoint before updating the portal readings 5 7 Configuring Your Device The Config page allows you to customize the Dashboard labels and the 4 20 mA settings For acc...

Страница 20: ...iew device readings but cannot make changes Can acknowledge alerts 5 11 Removing Users from Account To remove a user from an account go to the Manage Users page in the Portal Navigation Pane and click...

Страница 21: ...button at the bottom of the settings page for the paused device After the device has been un paused on the portal AND power has been cycled OFF and back ON the device will resume communication 5 14 De...

Страница 22: ...alled into Xbee Antenna disconnected Check antenna connection Poor cellular signal Check antenna for damage and good connection Install signal booster to increase signal strength Xbee communication Ch...

Страница 23: ...an Authorized Service Center is the responsibility of the purchaser Return transportation is provided by Phase Technologies 2 Installations must comply with all national and local electrical codes Ex...

Страница 24: ...Scan to download product information 222 Disk Dr Rapid City SD 57701 866 250 7934 Toll Free 605 343 7934 Main www phasetechnologies com...

Отзывы: