![Pharmacia Biotech 18-1016-85 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/pharmacia-biotech/18-1016-85/18-1016-85_user-manual_1536042021.webp)
4. Installation
18
The transfer sandwich can now be assembled on the bottom anode electrode.
Full assembly instructions are given in Section 4.8.
After assembling the transfer sandwich, saturate the upper cathode electrode
with distilled water and remove any excess with absorbent paper. With the
electrode lead to the front of the instrument, place the cathode electrode on
top of the stack.
Connect the cathode socket (black lead) to the cathode pin on the left of the
buffer tank.
Install the safety lid.
WARNING! Check that the electrodes are properly connected
before closing the lid. Always check that the lid is properly before
turning the power supply ON.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Содержание 18-1016-85
Страница 56: ...5 Operation 53 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 57: ...5 Operation 54 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 58: ...5 Operation 55 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 60: ...6 Maintenance 54 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 111: ...10 Ordering information 104 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 112: ...10 Ordering information 105 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...