
PFT ZP 3 L MULTIMIX Overview – Operation – Spare Parts Lists
Disassembly
50
2016-07-04
40.9 After performing maintenance
1. After maintenance has been completed, carry out the following
steps before switching on again:
2. Check that all previously loosened screw connections have a tight
fit.
3. Check that all previously removed protective devices and covers
have been properly reattached.
4. Ensure that all tools, materials and other equipment have been
removed from the work area.
5. Clean the work area and remove any traces of escaped material
(e.g. liquids, processing material etc.).
6. Ensure that all safety devices are functioning properly.
41 Disassembly
The machine must be disassembled and disposed of in an
environmentally sound manner after reaching the end of its
useful life.
41.1 Safety
Personnel
Disassembly may only be performed by specially trained personnel.
Work on electrical systems may only be carried out by qualified
electricians.
Basic information
WARNING!
Danger of injury due to improper disassembly!
Residual energy, sharp-edged components and corners
on and around the device or on the tools required can
cause injuries.
Therefore:
– Ensure there is adequate space before starting any
work.
– Exercise caution when working with open, sharp-
edged components.
– Keep the work area clean and tidy. Components and
tools that are stacked on one another or left lying
around can cause accidents.
– Disassemble components properly. Bear in mind that
individual components can be heavy. Use lifting
equipment if necessary.
– Secure components so they do not fall or tip over.
– Consult your dealer if questions arise.
Содержание 00 28 08 02
Страница 74: ...PFT ZP 3 L MULTIMIX Overview Operation Spare Parts Lists Spare parts drawing spare parts lists 74 2016 07 04...
Страница 78: ...PFT ZP 3 L MULTIMIX Overview Operation Spare Parts Lists 78 2016 07 04...
Страница 79: ...PFT ZP 3 L MULTIMIX Overview Operation Spare Parts Lists 2016 07 04 79...