
PFT ZP 3 L MULTIMIX Overview – Operation – Spare Parts Lists
Transport, packaging and storage
2016-07-04
21
20.2 Transport checklist
Inspect the goods for damage and missing parts
immediately after delivery.
If external transportation damage can be seen, proceed as
follows:
Do not accept the delivery, or accept it only under
reservations.
Note the damage on the transportation documents or the
delivery note of the carrier.
Submit the appropriate claim.
NOTE!
Always submit a claim for the defects as soon
as they are detected. Damage claims can only
be accepted within the applicable deadlines for
submission.
20.3 Transport by crane
Fig. 20: Transport by crane
When using a crane for transport, observe the following
requirements:
The crane and lifting equipment must be suitable for the
package weight.
The operator must be authorised to operate the crane.
Fastening the lifting gear:
1. Attach the machine at the eyelets (1) indicated using
ropes or straps.
2. Ensure that the package is suspended so it is level.
Adjust for off-centre balancing points if necessary.
3. Begin transport.
20.4 Transportation of operational machines
DANGER!
Danger of injury due to leaking mortar!
Injury to the face and eyes can occur.
Therefore:
- Make sure all hoses are depressurised before
opening the couplings (note the indicator on
the mortar pressure gauge).
Carry out the following steps before transporting:
1. Unplug the cable from the mains connection.
2. The mixing hopper MULTIMIX and the ZP 3 L material
hopper must be empty.
3. Remove the mortar and water hoses.
4 Begin transport.
1
1
1
Содержание 00 28 08 02
Страница 74: ...PFT ZP 3 L MULTIMIX Overview Operation Spare Parts Lists Spare parts drawing spare parts lists 74 2016 07 04...
Страница 78: ...PFT ZP 3 L MULTIMIX Overview Operation Spare Parts Lists 78 2016 07 04...
Страница 79: ...PFT ZP 3 L MULTIMIX Overview Operation Spare Parts Lists 2016 07 04 79...