ENGLISH
ENGLISH
DRAIN BODY INSTALLATION
7
8
10
FAUCET FUNCTIONS
11
9
7 SECURING FAUCET
From underneath sink, secure Faucet Body (
7A
) by placing Metal Washer (
7B
) and
threading Long Nut (
7
/
16
Hex.) (7C) onto Mounting Post (
7D
). Make sure that the bumps
on Metal Washer (
7B
) are facing up. Tighten loosely, make sure Handle (
7E
) swings
equally in both directions. Firmly hand tighten Long Nut (
7C
). Make sure Lift Rod (
7F
)
moves freely. Secure Long Nut (
7C
) not to exceed a
1
/
4
turn.
Caution: Do not over tighten!
8 WATER SUPPLY CONNECTIONS
Gently separate hot and cold Supply Tubes (
8A
), approximately three inches apart.
Connect water Supply Lines (
8C
) to Faucet Inlets (
8B
). Hot water supply line goes to hot
inlet fitting indicated by red tag (
8D
). (
Supply lines not included
). Follow manufacturer’s
instructions when installing supply lines.
Do not twist Supply Tubes (8A)!
9 POP-UP INSTALLATION
Install and adjust Pop-Up (
9A
) using separate instructions supplied with the Pop-Up
assembly.
10 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
11 VALVE FUNCTION
By lifting the Lever Handle (
11A
) up, the valve will be activated allowing water to flow.
The water flow will increase by continuing to lift up the Lever Handle (
11A
). By rotating
the Lever Handle counter-clockwise, the water temperature will decrease to cold flow
only. By rotating the Lever Handle clockwise, the water temperature will increased to
hot flow only.
Note:
Flush faucet before turning on valve (
see figure 12
).
3
7A
7F
8A
7B
7C
7D
7E
8A
8C
8C
8B
8B
8D
HOT
COLD
11A
11A
OPEN
HOT
COLD
9A
Содержание AMHERST 42 Series
Страница 11: ...FRANÇAIS FRANÇAIS 11 ...