Installation and commissioning
14 | 22
Operating Instructions Sample Divider Model 8 / Model 32 | Revision 6
Lashing
Figure 4: Diagram of transport by forklift
Drive so the tines of the forklift truck pass between or under-
neath the spars of the pallet/crate.
The tines must protrude on the opposite side!
Unpacking
In order to avoid damages to the casing and other components,
Open the packaging by cutting the tension bands.
Remove the fibreboard cover and remove the styrofoam packaging elements.
Lift the
Sample Divider
with at least two people from the transport pallet.
Pay attention to the specific weight, see
chapter 3.
WARNING
Risk of suffocation
Packaging materials (e.g. film, polystyrene, cardboard boxes) can be dangerous to
children.
Keep packaging material away from children.
Do not leave packaging material lying around carelessly.
Dispose of packaging material in an environmentally friendly way.
Packaging for return delivery
If possible, use the original packaging and the original packaging material. If neither is available any
longer, request new packaging from Pfeuffer GmbH.
5
Installation and commissioning
The chapter installation and commissioning is intended for
skilled personnel
only.
Positioning of
Sample Divider
Unpack the
Sample Divider
carefully (refer to
chapter 4.4
) and place it horizontally.
Ensure that a firm footing on a non-slip surface is provided.
Avoid exposure to direct sunlight and extreme ambient conditions.
Make sure that the installation height is ergonomic according to the stature of the operating personnel.
A correct horizontal positioning of the machine guarantees an even division of the grains.