background image

6

MVP 055-3, MVP 055-3C

The pump is equipped with four separately operating pump
stages A, B, C, D which are connected via hoses to form a
three-stage vacuum pump.

– The vacuum connection A1 is equipped as follows:

MVP 055-3 --> 

hose connection DN 10

MVP 055-3C --> small flange DN 16 ISO-KF.

– Depending on the pump version, the exhaust connection

2.1. of the MVP 055-3/-3C is fitted as follows:
MVP 055-3 --> 

silencer (standard), small flange 
DN 16 ISO-KF (option).

MVP 055-3C --> corrugated hose DN 10 (standard),

small flange DN 16 ISO-KF (option).

3. Installation 

3.1. Setting Up The Pump And Location

Be sure to select the correct pump version whe-

re the pumping of possibly aggressive media are
involved.

Place pump on a smooth, even surface.

Anchor the pump if it is to be erected in a stationary positi-
on.
– Avoid mechanical stresses due to rigid connections. Ins-

ert elastic hoses or resilient elements as couplings
between the pump and rigid pipes.

Maximum ambient tempe12 ... +40 °C.
– Make sure ventilation is adequate if pump is installed in

a enclosure or if ambient temperature is elevated.

– If pump is installed above 1000 m above mean sea level

check compatibillity with applicable safety require-
ments, e. g. DIN VDE 0530 (motor may overheat due to
insufficient cooling).

3.2. Connection of Pumping Stages

Check the hose connections for the correct type of
connecting pieces before connecting the pump to the
vacuum chamber.
– Intake and outlet connections are marked with “IN” and

“EX” respectively at the membrane heads.

Interchanging the connections will result in

impermissibly high over-pressure levels.

MVP 035-2

The pump functions on the two stage principle. 
On the two membrane heads A and B the intake connection is
marked with an “IN” and the exhaust connection with an
“EX” to prevent confusion. 
– The vacuum connection (intake side) is provided with a 1m

plastic hose and G 1/4“ screw (option: small flange) for
connection to a PFEIFFER turbopump.

– The exhaust connection of the MVP 035-2 is provided with

a silencer and can also retrovit to small flange connection.

PU011persp

MVP 055-3C with small flange

A1 Vacuum connection with small 

flange DN 16

IN Vacuum connection at membrane 

heads

2.1 Exhaust connection
EX Exhaust connection at membrane 

heads

A

Membrane head 1

B

Membrane head 2

C

Membrane head 3

D

Membrane head 4

E

Voltage supply

28 Hose connection
40 Gas ballast valve

D

E

A1

A

EX

B

28

C

28

EX

IN

V

IN

2.1(EX)

IN

40

Содержание MVP 035-2

Страница 1: ...Membranvakuumpumpen Diaphragm Vacuum Pumps PU 800 011 BE G 0211 MVP 035 2 MVP 055 3 MVP 055 3C Betriebsanleitung Operating Instructions...

Страница 2: ...formation 9 4 2 Operation With Gas Ballast 9 4 3 Shutdown 10 5 What To Do In Case Of Breakdown 11 6 Maintenance 11 6 1 Precautionary Measures During Maintenance Work 11 6 2 Cleaning And Replacing Diap...

Страница 3: ...anger of personal injury 1 2 Pictogram Definitions 1 1 For Your Orientation Instructions in the text Operating instructions Here you have to do something Symbols used The following symbols are used th...

Страница 4: ...tor switch 23 Hose connection Diaphragm Vacuum Pump MVP 055 3C with small flange connection A1 Vacuum flange 2 1 Exhaust connection A Membrane head 1 B Membrane head 2 C Membrane head 3 D Membrane hea...

Страница 5: ...Do not pump corrosive or explosive gases Do not pump liquids Do not operate the pump in locations where there is an explosion hazard Accessories other than those named in this manual may not be used w...

Страница 6: ...above mean sea level check compatibillity with applicable safety require ments e g DIN VDE 0530 motor may overheat due to insufficient cooling 3 2 Connection of Pumping Stages Check the hose connecti...

Страница 7: ...ossible Connect pump with intake connection to the apparatus If liquid which would generate vapours is present in the system to be evacuated a condensate trap must be fitted upstream of the pump 3 4 C...

Страница 8: ...ns voltage must be checked before each installation or re location of the diaphragm pump Use an appropriate screwdriver on the diaphragm pump voltage selector switch to select the range which correspo...

Страница 9: ...ballast valve open ultimate vacuum will be reduced pumping speed is decreased In case of low boiling solvents when the forma tion of condensate is unlikely the use of gas ballast might be unnecessary...

Страница 10: ...ome hot The pump attains the stated values for through put rates and final pressure levels only once the operating temperature is reached after approximately 15 minutes PLEASE NOTE BEWARE PLEASE NOTE...

Страница 11: ...d to carry out maintenance and repair work and the regulations must be observed 6 Maintenance Problem Possible cause Remedy Pump does not attain final pressure Condensate in the pump Run pump for a lo...

Страница 12: ...erchange these two parts Head cover K1 has on the intake side an additional groove in the valve seating Remove head cover K1 K2 from housing cover 1 to check valve seals 11 Taking care with the positi...

Страница 13: ...cover 1 Taking care with the position of valve seals 11 Fig 9 remove and check for damage and replacing if necessary The inlet valve seal in the third stage and the outlet valve seal 11a in the second...

Страница 14: ...16 and screw in diaphragm and spring washer Further assembly as per Section 6 2 2 PLEASE NOTE 11a 12 9 26 1 11b 2 16 3 10 4 6 17 2 3 2 3 2 3 10 Diaphragm 11a Inlet valve seal 3 stage and outlet valve...

Страница 15: ...ing cover panel 6 must be dismantled Using a standard trade face spanner size 40 4 turn diaphragm support washer 9 thereby loosening diaphragm 10 Remove diaphragm spring washer 3 with square connectin...

Страница 16: ...stem down time is kept to a minimum Have the pump repaired on the spot by our PFEIFFER Service Engineers Return the individual components to the manufacturer for repairs Replace individual components...

Страница 17: ...e gas and environment temperature C 12 40 12 40 12 40 Overload protection with enclosed temperature switch C 155 155 155 Noise level dB A ca 49 ca 52 ca 52 Motor insulation material class B IP 54 IP 2...

Страница 18: ...18 8 1 Dimensions 134 17 263 171 235 71 192 ca 263 103 262 125 MVP 035 2...

Страница 19: ...19 ca 189 281 314 321 143 134 ca approx 235 241 ca approx 262 266 ca 184 M6 MVP033 3C MVP 055 3 MVP 055 3C Measurements in brackets only valid for MVP 055 3C...

Страница 20: ...ss steel Corrosive gas version pump MVP 055 3C Pos Description Piece Size Order Number Comment Ordered Quantity Mains cable for individual wiring 1 3 m PK 050 111 not included in the and for connectin...

Страница 21: ...ing plate Please use this list as an order form by taking a copy Spare part list MVP 035 2 Pos Description Pieces No Set of seals Pos 10 11 1 PK 050 116 T 2 1 Silencer 1 P0 920 412 E 2 3 Usit seal rin...

Страница 22: ...he repair and or service of vacuum components will only be carried out if a correctly completed declaration has been submitted Non completion will result in delay The manufacturer could refuse to acce...

Страница 23: ...w is in accordance with the provision of EU Machinery Directive 98 37 EEC Annex II A EU Electromagentic Compatibility Directive 89 336 EEC and EU Low Voltage Directive 73 23 EEC Produkt Product MVP 03...

Страница 24: ...Email pfeiffer hakuto co jp Korea Pfeiffer Vacuum Korea Ltd 703 Ho 853 1 Hankuk Mulru Dongchonri Suzi Eup 449 843 Yong in City Kyungkido Phone 82 31 266 0741 Fax 82 31 266 0747 Email sales pfeiffer va...

Отзывы: