background image

10

4.1. Filling Up And Checking The Operating

Fluid

Standard version pumps are tested with opera-
ting fluid P3. Guarantees relating to attainment
of final pressures and trouble free functioning
apply only providing this operating fluid is used.

The delivery consignment contains sufficient operating fluid
for one filling (valid only for P3).

Pumps for special applications (e.g. for pumping corrosive
gases) can be operated with special operating fluids such as
F5 and other Pfeiffer Vacuum operating fluids. The use of
such operating fluids requires prior authorisation from the
manufacturer.
P3 must be disposed of in accordance with local waste dispo-
sal regulations.

Remove operating fluid filler screw 42.

Fill up with operating fluid included in the consignment
(only for P3); refer to rating plate for correct quantity.

Replace operating fluid filler screw 42; be careful with the
O-ring.

CAUTION

Check operating fluid level only when the pump is warm
and running and vacuum connection 1 and gas ballast
valve are 

closed.

The level of operating fluid must always be between the
top and the middle of the sight glass 44.

Topping up operating fluid is possible when the pump is
running and in final vacuum operations.

In non-stop operations check operating fluid daily,
otherwise whenever the pump is switched on.

4. Operations 

Rotary Vane Vacuum Pumps UNO/DUO 250 A

1

Vacuum flange, 

2

Exhaust flange, 

3 Motor, 
5

Socket for control voltage

15

Casing

28

Support stand

42

Operating fluid filler screw

43

Operating medium drain screw

44

Sight glass

45

Gas ballast valve, complete; 

182 Pressure gauge
183 Cover for filter cleaning

15

42

1

2

182 45

44

43

18

5

28

3

Sight glass 44

Operating fluid
level for the first
filling and during
operation

4.1.2. Operating Fluid F5

Only the synthetic operating fluid F5 may be used for corrosi-
ve gas model pumps. The use of other operating fluid must be
cleared by the manufacturer.

When working with synthetic operating media,
the manufacturer’s directions must be
observed.
If ‘’F5’’ is heated above 250°C, toxis vapours
which can harm the airways are given off.

Do not allow ‘’F5’’ to come into contact with tobacco products
(danger of poisoning when ignited). The precautions
necessary in the handling of chemicals must be observed.

Operating fluids containing toxic or aggressive

substances require special treatment. The
instructions for handling such media must be
observed.

Never fill into pumps which contain mineral oil
residues.

If there is a noticeable loss of operating fluid,

the radial shaft seals should be checked.
If operating fluid is leaking out underneath the
casing 15 from the opening between the
support stand 28 and motor 3, the radial shaft

seal must be replaced. Please contact your local Pfeiffer-
Service (see Section 7.).

PLEASE NOTE

CAUTION

DANGER

WARNING

Содержание DUO 250 A

Страница 1: ...Rotary Vane Pumps PD 0010 BE C 0511 UNO DUO 250 A Betriebsanleitung Operating Instructions...

Страница 2: ...10 4 2 Switching The Pump ON And OFF 11 4 3 Operating The Pump With Gas Ballast Valve 11 4 3 1 Standard Model 11 4 3 2 Corrosive Gas Model 11 4 4 Pumping Off Dry Gases 12 4 5 Pumping Off Vapours 12 5...

Страница 3: ...on the pump When returning the pump to us please note the shipping instructions in Section 7 1 1 For Your Orientation Instructions in the text Operating instructions Here you have to do something Symb...

Страница 4: ...s and sight glasses made from special materials Option Special gas ballast valve for inert gas inlet N2 to prevent atmospheric air entering the system Improper Use The following are regarded as improp...

Страница 5: ...For Installation Do not carry out any unauthorised conversions or modifications on the pump Fill up with operating fluid before operating the first time included in a separate pack in the delivery co...

Страница 6: ...eve strainer from vacuum flange 1 and exhaust flange 2 Switch on pump for a short time max 3 seconds Motor motor fan must turn clockwise see arrow P on motor fan cover If direction of rotation is inco...

Страница 7: ...Current Motor Circuit The three phase motor winding consists of three identical coils Delta Connection The three coils are connected in series with the connection point connected to the mains The vol...

Страница 8: ...69 Locking screw for connecting the gas ballast valve when no valve is fitted 45 169 122 132 133 135 126 128 118 134 136 168 138 Important The instructions in 4 1 2 must be observed when working with...

Страница 9: ...pecial gas ballast valve with dosing device and hose connection for flushing gas is available on request Corrosive Gas Models Corrosive gas models are manufactured with special materials The rotor sha...

Страница 10: ...switched on 4 Operations Rotary Vane Vacuum Pumps UNO DUO 250 A 1 Vacuum flange 2 Exhaust flange 3 Motor 5 Socket for control voltage 15 Casing 28 Support stand 42 Operating fluid filler screw 43 Ope...

Страница 11: ...e Gas Model Gas ballast valve 45 is fitted with a dosing device and a flushing gas connection It has a sliding sleeve which opens the valve when pushed towards the pump and shuts the valve when pushed...

Страница 12: ...Request repair by Pfeiffer Vacuum Service Pump doesn t start Ambient temperature 12 C Warm up pump Dirty pump stages Request cleaning by Pfeiffer Vacuum Service Damaged pump stages Request repair by P...

Страница 13: ...perating fluid should be changed every 8000 h at least once a year Replacing The Operating Fluid Switch off the pump Unscrew operating fluid drain screw 43 and drain operating fluid The operating flui...

Страница 14: ...pletely clockwise Slowly open the valve spindle 47 1 2 to a complete turn until the knocking noise is no longer audible Replace locking screw 46 or operating fluid filler screw 42 paying attention to...

Страница 15: ...is dusty Dismantling and assembling the Standard Model Unscrew valve housing 68 at hexagon nut take care with the O ring 31 if necessary proceed as follows Remove circlip 59 and pull off sleeve 61 in...

Страница 16: ...e gas models 13 Silencer 14 Non return valve 28 Support stand 31 O ring 34 Cover 47 Valve spindle 48 O ring 49 O ring 50 Valve housing 51 Plate spring 52 Screw 53 O ring 54 Screw 55 Insert 56 Screw 57...

Страница 17: ...n operating fluid drain screw 43 keep an eye on the position of the O ring Allow pump to run for about 10 seconds with open vacuum flange Drain off remaining operating fluid Fill up pump with fresh op...

Страница 18: ...ation work Units which are contaminated microbiologically explo sively or radioactively cannot be accepted as a matter of principle Fill Out The Contamination Declaration In every case the Contaminati...

Страница 19: ...ity 50 Hz g h 5100 4350 60 Hz g h 6000 5200 Emission sound pressure level without gas ballast dB A 75 75 Operating fluid amount l 30 23 Max admissible operating temperature 1 C 90 90 Nominal rotation...

Страница 20: ...the full part number When ordering spare parts please state additionally the unit type and unit number see rating plate Please use this list as an order form by taking a copy Pos Description Quantity...

Страница 21: ...he repair and or service of vacuum components will only be carried out if a correctly completed declaration has been submitted Non completion will result in delay The manufacturer could refuse to acce...

Страница 22: ...the product specified below is in accordance with the provision of EU Machinery Directive 98 37 EEC EU Electromagentic Compatibility Directive 89 336 EEC and EU Low Voltage Directive 73 23 EEC Produk...

Страница 23: ...23...

Страница 24: ...49 0 64 41 8 02 2 02 info pfeiffer vacuum de www pfeiffer vacuum net Vacuum is nothing but everything to us Turbo Pumps Rotary Vane Vacuum Pumps Roots Pumps Dry Vacuum Pumps Leak Test Units Valves Fl...

Отзывы: