8 PFAFF
3
Examination before commissioning
After the machine is unpacked and before commissioning it must be examined for damage in
transit.
In cases of damage, be sure to inform both the forwarding agent and the PFAFF agency
responsible.
4
Setting up the machine
Set up the machine horizontally at its intended location
On newly commissioned machines or on machines which have not been used for a
long time be sure to check the hook oil supply (see chapter 8.4).
5
Compressed air and electrical connection
5.1
Compressed air
Connect compressed-air hose (internal dia. of 6 mm) to coupling (Fig. 1).
Minimum supply pressure:7 bar
Working pressure: 6 bar
Pressure adjustment:
regulating knob 2
5.2
Electrical
.1
Permissible operating power is indicated on spec. plate (Fig. 2).
Note:
The operating voltage indicated on the specification plate refers to the control.
It is not necessarily applicable to the entire system!
.2
Connection must only be made if mains and operating voltage coincide.
.3
The machine must only be connected to a suitable earthed socket.
6
Switching the machine on
.1
Open compressed air supply.
.2
Check working pressure: 6 bar (gauge 3, Fig. 1)
.3
Re-adjust if necessary (regulating knob 2).
.4
Switch on machine (rotary switch 4 to
“ON”
, Fig. 3)
7
Switching the machine off
Set tumbler switch
4
at
“0”
(fig. 3).
Содержание 3822-1/22
Страница 9: ...PFAFF 9 1 1 2 3 WARTEIN CDR 1 Kap03 2N 2 3 4 ...
Страница 11: ...PFAFF 11 1 KAP10 04 2 3 1 2 ÖL N ...
Страница 13: ...PFAFF 13 KAP07 1N KAP07 2N 2 1 1 1 2 3 5 6 4 ...
Страница 15: ...PFAFF 15 1 2 KAP13 02 2 4 3 KAP12 03 3 5 1 KAP08 04 ...
Страница 17: ...PFAFF 17 02 01 2 4 3 1 3 2 5 02 02 1 01 01 5 mm ...
Страница 19: ...PFAFF 19 1 KAP06 2N 5 8 2 3 03 01 1 45 45 45 45 45 2 2 03 2A 4 5 26 01 4 3 9 10 11 6 1 7 17 2N ...
Страница 21: ...PFAFF 21 1 1 1 1 1 KAP05 00 1 2 4 KAP08 04 4 5 2x 4 3 KAP08 04 3 2x 2 17 2N ...
Страница 25: ...PFAFF 25 KAP29 05 2 1 2 Lehrenfuß Best Nr 61 111639 20 1 3 3 4 0 5 mm 6 5 4 KAP30 05 ...
Страница 29: ...PFAFF 29 KAP33 02 2 1 11 02 2 3 KAP29 05 4 6 KAP31 01 5 12 02 1 0 9 8 7 5 6 4 3 2x 1 1 1 1 1 KAP05 00 1 ...
Страница 31: ...PFAFF 31 KAP13 01 1 2 1 2 3 4 KAP29 05 3 6 5 ...
Страница 33: ...PFAFF 33 2 1 KAP03 01 1 2 3 2x KAP17 01 0 3 mm 7 2x 4 5 3 6 KAP17 2N ...
Страница 39: ...PFAFF 39 2 KAP01 X1 1 2 0 5 mm KAP45 01 1 5 7 mm 4 KAP48 02 1mm KAP47 01 8 3 1 0 9 7 6 5 3 4 ...
Страница 41: ...PFAFF 41 KAP32 01 2 6 5 KAP29 05 1 3 4 2 1 12 mm ...
Страница 43: ...PFAFF 43 KAP52 01 3 KAP32 01 2 KAP52 02 5 8 1 0 1 7 1 1 1 2 1 3 3 9 6 2 4 1 3x ...
Страница 45: ...PFAFF 45 6 4 KAP54 01 1 3 9 8 5 1 10 2x 7 BI 02N 2 KAP31 02 KAP10 01 2 3 ...
Страница 47: ...PFAFF 47 1 5 05 00 4 3 56 04 9 1 0 5 0 5mm 56 xx 56 01 1 2 3 4 5 7 8 6 2 ...
Страница 49: ...PFAFF 49 56 5x 6 7 56 04 12 13 15 8 57 02 9 1 0 56 07 9 56 06 1 9 1 8 5 mm 1 6 1 7 14 11 21 20 ...
Страница 51: ...PFAFF 51 2 KAP56 01 3 6 5 4 KAP33 02 1 1 2 3 ...
Страница 53: ...PFAFF 53 KAP56 02 4 8 7 KAP33 02 5 1 2 9 10 11 12 1 3 7 1 0 9 max 0 1mm 6 10 9 ...
Страница 55: ...PFAFF 55 8 15 14 17 KAP56 01 9 16 20 1 1 7 8 12 KAP33 02 9 1 0 18 2 0 ...
Страница 57: ...PFAFF 57 KAP56 10 KAP56 11 2 0 2 1 14 KAP33 02 24 22 23 15 7 0 05 0 1mm Cutting angle exaggerated KAP56 09 ...
Страница 59: ...PFAFF 59 17 9 KAP33 02 18 2 3 of cutting edge 7 25 18 56 22 21 2 0 9 1 9 18 KAP56 01 4 1 6 1 7 BI 02N ...
Страница 61: ...PFAFF 61 21 7 26 8 27 28 ...
Страница 63: ...PFAFF 63 23 3 5 33 35 3 4 20 22 29 30 31 3 2 3 6 3 6 Sensor1 ...
Страница 65: ...PFAFF 65 2 6 37 2 5 2 4 38 39 20 32 31 ...
Страница 67: ...PFAFF 67 KAP57 01 2 1 1 6 5 KAP33 02 3 2 3 4 2 BI 02N ...
Страница 69: ...PFAFF 69 4 1 2 3 3 4 2 1 918 15N 5th graduation on scale zero position ...
Страница 71: ...PFAFF 71 5 7 6 1 918 15N ...
Страница 73: ...PFAFF 73 10 01 1 2 6 6 6 5 7 918 15x 9 1 0 9 7 8 8 918 15N 1 0 1 1 ...
Страница 75: ...PFAFF 75 1 4 1 3 ...