
20
Mounting and commissioning the machine
Fig. 8 - 02
8
.02
Mounting the spool holder
●
Mount the spool holder according to
Fig.
8
.
02
.
8
.03
Commissioning
●
Before commissioning the machine, clean it thoroughly and lubricate it, or pour in oil,
see Chapter
12
Care and Maintenance
!
●
The machine, in particular the electric wires and pneumatic connection tubes, must be
examined for any damage.
●
Have skilled personnel check if the machine can be operated with the available mains
voltage.
Do not operate the machine if there is any discrepancy.
The machine may only be connected to an earthed socket!
●
Connect machine to the compressed air system.
The manometer on the air fi lter/lubricator unit must display a pressure of
6
bar.
If necessary, set to the correct value (see chapter
12
.
05
Checking / regulating air
compression
).
Содержание 3108-1/1306
Страница 89: ...89 Circuit diagrams Version 10 02 11 91 191 543 95 Part 1...
Страница 90: ...90 91 191 543 95 Part 2 Version 15 03 10 Circuit diagrams...
Страница 91: ...91 Circuit diagrams Version 15 03 10 91 191 543 95 Part 3...
Страница 92: ...92 91 191 543 95 Part 4 Version 10 02 11 Circuit diagrams...
Страница 93: ...Note...