Page
21
of 28
Brightwell 400P
–
July 2022 v1
Pevex Stoves - Brightwell 400P
– Installation & Operating Manual
FIREBOARD REMOVAL & REPLACEMENT
Fig 12 - Firebox
Fig 13 Section of the Firebox Showing the Inside view of the stove
FIRE BRICK REMOVAL PROCEDURE:
Firstly open the door and remove the log retainer from
the front of the firebox
1 & 2
Lift up the front of the (1) bottom baffle (30mm
thick fireboard) to allow the two side firebricks (2) to drop
into the firebox & be removed (see Fig 12).
Angle the bottom baffle (1) up on the RHS to allow the
LH edge of the baffle to drop into the firebox, allowing
for its removal.
3 Top Baffle Fire Board -
Lift the back of the top baffle
fire boards upwards out of the saddle it sets in, whilst
pushing it back to allow the front edge to drop into the
firebox (see Fig 13).
4
Top Baffle Fire Board
- When refitting the Top Baffle
Fire Board make sure this board is pulled to the tight to the
front to seal into the holder
Replace the components in reverse order when
cleaning is complete, ensuring that the long face of the
top baffle is facing downwards when fitted.
5 Rear Fire Boards
– to remove these 2 boards pull
hard from the top of each board as they are held in
place with heatproof silicon which seal the tertiary air
holes against the stove back plate. When refitting again
reseal around all of the air holes to prevent air leakage
between the rear fire board and back of the stove
1
2
2
Top Baffle
Board
Mounting
Saddle
3
1
Top Baffle
Fire Board
Qty x 1
Bottom
Baffle Fire
Board
Qty x 1
Rear Fire
Boards
Qty x 2
4
5