POWER UNIT
56
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
- Suspend the rear of the machine
- Remove the shock absorber upper mount
(9).
Tightening torque: 45 Nm.
When re-installing, use a new nut.
- Remove the linkrod-to-engine connecting pin
(10).
Tightening torque: 60 Nm.
When re-installing, use a new nut.
- Remove the power propulsion unit from the
frame.
- Remove the covers from the power unit.
9
10
Содержание SPEEDFIGHT 3 RS
Страница 1: ...Sales division Technical network leadership WORKSHOP MANUAL ...
Страница 2: ......
Страница 59: ......