SERVICE AND COMMISSIONING PLAN
Page: 6
Reproductions or translations, even parrtial, are forbidden without the written consent of Peugeot Motocycles
Battery commissioning and maintenance procedure
Remark: the maintenance procedure is identical to the commissioning procedure
Important:
It is essential to use distilled water supplied by PEUGEOT MOTOCYCLES under P/N: 973582
The use of distilled water from another sources will destroy the battery.
It is forbidden to pour in distilled water before the end of charging.
Commissioning:
Ensure you have 3 litres of PEUGEOT distilled water, P/N: 973582.
•
Connect the charge cable to the 230 V – 10/16 A mains.
•
The charge lamp
comes on with a beep, the battery lamp
flashes
•
Press key “V” on the keypad there is a beep and hold until there is a second beep.
•
Release the « V » key, a series of 3 beeps indicates the operation is to commence, the charge lamp
flashes.
•
If it does not flash, repeat the operations more quickly.
The commissioning procedure has started and will take 10 to 15 minutes.
At the end of charging, the
lamps stay on indicating that water may be added to the battery.
Note:
From this point on, you may leave the machine connected to the mains for a period of 72 hours. Beyond this
time, you will have to repeat the procedure from the start.
•
Disconnect the charging cable, the
lamps stay on. You now have a maximum of 30 minutes to
add water to the battery.
•
Open the maintenance cover with a Torx screwdriver and slowly pour in the distilled water (P/N:
973582) until the water runs out of the overflow under the scooter.
•
Close and tighten the maintenance cover, the
lamps go off indicating the end of
commissioning.
•
Wait for a minimum of 15 seconds before turning on the ignition.