ELECTRICITY
Page: 15
Reproductions or translations, even partial, are forbidden without the written consent of Peugeot Motocycles
Cell fitting order
If the 3 cells are changed
Fit a cell, marked G at (A), on the right-hand side of
the machine with the red terminal at the front
Fit a cell, marked D at (A), on the left-hand side of the
machine with the red terminal at the rear
Fit the plastic clamp (8) for the 2 rear cells (2 screws)
Connect the water pipes (2) (9)
Push the 2 cells into the frame housings
Fit the securing clamp (3) for the 2 cells (with the
washers and cups)
Clip the temperature sensor (12) to the left cell
Fit the last cell marked D with the red terminal at the
front
Fit the strap between the front and rear right-hand
cells (2 nuts)
Fit the strap protection
Fit the front cell securing clamp (with washers and
cups)
Fit the 200A fuse (13) (2 nuts and 2 washers)
connecting the blue terminal of the rear right-hand
cell to the red terminal of the rear left-hand cell
Fit the fuse cover
Connect the thick cable with the red end (+)
connected to the ECU to the red terminal on the front
cell
Connect the thick cable with the green end (-) to the
blue terminal on the rear left-hand cell
Important:
A battery commissioning procedure must be
carried out (see procedure page 5) and the ECU
parameters initialised using the TEP96