RCP-CSD
Chapter 2 – Installation
3
Chapter 2 – Installation
Shipping Damage Inspection
Immediately upon receipt, all shipping containers should be inspected for damage caused in transit. If any
damage is noted, save all packing material and contact both PESA and the carrier as soon as possible.
Unpacking
CAUTION
This equipment contains static sensitive devices. A grounded
wrist strap and mat should be used when handling the internal
circuit cards.
Carefully unpack the equipment and compare the parts received against the packing list and Table 1. If any
parts appear to be missing, please contact PESA immediately.
Table 1. Equipment List
Part No.
Description
Quantity
Required
81-9065-2165-0
RCP-CSD Remote Control Panel
1 ea
81-9023-0112-0
Power Adapter – U.S.A.
120VAC, 60Hz
Note 1
81-9023-0122-0
Power Adapter – U.K.
240VAC, 50Hz
Note 1
81-9023-0123-0
Power Adapter – Continental Europe
230VAC, 50Hz
Note 1
Note 1: This item is optional or may be ordered in varying quantities.
Please consult your purchase order to verify that you have received the
correct quantity.
Installation Location
This equipment is designed to be installed in a standard 19-inch equipment rack located in an environment
conforming to the specifications shown in Chapter 1. Each unit should be located as close as possible to its
associated equipment to minimize cable runs.
Consideration should be given to the connection of this equipment to the supply circuit and the effect that
possible overloading could have on overcurrent protection circuits and supply wiring. Refer to the nameplate
ratings when addressing this concern.
Содержание RCP-CSD
Страница 4: ...RCP CSD...
Страница 16: ...RCP CSD 8 Chapter 2 Installation...
Страница 40: ...RCP CSD 32 Chapter 3 Operation...
Страница 42: ...RCP CSD 34 Chapter 4 Maintenance and Repair...
Страница 50: ...RCP CSD 42 Glossary Figure B...
Страница 68: ......