background image

PERMON s.r.o.                      VKP 95-1 – OPERATION MANUAL                PAGE 2 

Contents

 

Preface........................................................................................................................3 

Principles of Operation ................................................................................................3 

Specifications ..............................................................................................................3 

Parts List .....................................................................................................................4 

Safety Precautions ......................................................................................................4 

Preparation for Drilling and Drilling..............................................................................5 

Lubrication...................................................................................................................6 

Weight on Bit...............................................................................................................7 

Rotation Speed ...........................................................................................................7 

Suggested Operating Procedures ...............................................................................7 

Disassembly ................................................................................................................8 

Assembly.....................................................................................................................9 

Storage........................................................................................................................9 

Содержание VKP 95-1

Страница 1: ...Down the Hole Hammer VKP 95 1 O P E R A T I O N M A N U A L...

Страница 2: ...ntents Preface 3 Principles of Operation 3 Specifications 3 Parts List 4 Safety Precautions 4 Preparation for Drilling and Drilling 5 Lubrication 6 Weight on Bit 7 Rotation Speed 7 Suggested Operating...

Страница 3: ...ve in a wide range of rock types ranging from unconsolidated limestones to the hardest granite and quartz formations Since the hammer force is applied directly to the drill bit power transmission loss...

Страница 4: ...UCK IR3 5 OPTIONAL 2 273109 O RING 55X2 3 2361120 SPLIT RING VKP 95 1 3 2361510 SPLIT RING IR3 5 OPTIONAL 4 4342580 CYLINDER 5 5009200 PISTON COMPL 6 722090 PISTON VALVE 7 5100060 BACKHEAD ASSEMBLY 8...

Страница 5: ...lling conditions If the drilling formation is known proper precautions can be taken to avoid potential danger Respect the equipment Do not operate the hammer at excessive pressures or speeds Follow th...

Страница 6: ...tend to blow the hole apart After a few feet of drilling increase the total weight on the bit until the hammer runs smoothly The air pressure will rise slowly then stabilise Caution Always apply the...

Страница 7: ...sive formations Do not use high rotary speed Using too high of a rotary speed leads to scuffing or breakage of the carbide inserts on the drill bit Adjust the rotation to obtain the best drilling rate...

Страница 8: ...ill bit carbides always sharp to keep the maximum penetration rate avoid bit breakage and reduce hammer overload Important Do not reverse rotate the drill pipe due to the danger of unscrewing either t...

Страница 9: ...mer into service With the hammer assembled and immediately before returning to service pour for some rock drill oil into the hammer Fill the level of the backhead then release the check valve allowing...

Отзывы: