Disassemble  the  backhead  assembly.  Remove  the  rubber  check  valve  seat,  check 
valve and spring. 

Assembly 

Important: Before assembling the hammer, insure all components are inspected and 
restored to the best possible condition or replaced, if needed.  

Insure  all  components  are  thoroughly  cleaned  to  remove  any  residual  emery  dust, 
steel flings or corrosion. Thread lubricant MUST be used on all threaded connections 
and  bit  shank  and  splines.  Coat  all  new  or  reworked  components  with  rock  drill  oil. 
When the hammer is put back into service, this coating protects parts, until the line 
oil  starts  injecting  the  proper  amount  of  oil  into  the  air  stream.  All  threaded  joints 
must  be  properly  tightened  before  returning  the  hammer  into  service.  With  the 
hammer  assembled  and  immediately  before  returning  to  service,  pour  -  for  some 
rock drill oil into the hammer. Fill the level of the backhead, then release the check 
valve allowing the oil to flood the hammer. 

Storage 

Disassemble the hammer completely. 

Thoroughly clean and repair all components. 

Reassemble the hammer immediately, keeping the joints loose. 

Coat the entire hammer, OD and ID, with a light film of rock drill oil. Coat all threads 
with thread lubricant. 

Install thread protectors. 

Seal each end of the hammer to keep dirt and dust out of the hammer. 

Always store the hammer in a suitable protective container in a dry location. 

Grease the bit shank. 

Place a protective cover on top of the bit to prevent foot valve breakage. 

Always store the bit in a suitable protective container in a dry location. 

 

 

 

 

 

PERMON s.r.o. 

Roztoky 217 

27023 Krivoklat 

Czech Republic 

 

Tel.: +420 313 558 145 

Fax: +420 313 558 313 

Email: 

[email protected]

 

www.permon.cz 

Содержание VKP 95-1

Страница 1: ...Down the Hole Hammer VKP 95 1 O P E R A T I O N M A N U A L...

Страница 2: ...ntents Preface 3 Principles of Operation 3 Specifications 3 Parts List 4 Safety Precautions 4 Preparation for Drilling and Drilling 5 Lubrication 6 Weight on Bit 7 Rotation Speed 7 Suggested Operating...

Страница 3: ...ve in a wide range of rock types ranging from unconsolidated limestones to the hardest granite and quartz formations Since the hammer force is applied directly to the drill bit power transmission loss...

Страница 4: ...UCK IR3 5 OPTIONAL 2 273109 O RING 55X2 3 2361120 SPLIT RING VKP 95 1 3 2361510 SPLIT RING IR3 5 OPTIONAL 4 4342580 CYLINDER 5 5009200 PISTON COMPL 6 722090 PISTON VALVE 7 5100060 BACKHEAD ASSEMBLY 8...

Страница 5: ...lling conditions If the drilling formation is known proper precautions can be taken to avoid potential danger Respect the equipment Do not operate the hammer at excessive pressures or speeds Follow th...

Страница 6: ...tend to blow the hole apart After a few feet of drilling increase the total weight on the bit until the hammer runs smoothly The air pressure will rise slowly then stabilise Caution Always apply the...

Страница 7: ...sive formations Do not use high rotary speed Using too high of a rotary speed leads to scuffing or breakage of the carbide inserts on the drill bit Adjust the rotation to obtain the best drilling rate...

Страница 8: ...ill bit carbides always sharp to keep the maximum penetration rate avoid bit breakage and reduce hammer overload Important Do not reverse rotate the drill pipe due to the danger of unscrewing either t...

Страница 9: ...mer into service With the hammer assembled and immediately before returning to service pour for some rock drill oil into the hammer Fill the level of the backhead then release the check valve allowing...

Отзывы: