INSTALLATION INSTRUCTIONS
Prior to installation, check pit for correct depth and square-ness of pit across corners.
If pit is not correct in size and square-ness, make corrections before installation dock
board.
IMPORTANT
Do not break bands on dock board until called for in Step 4,
otherwise damage may
occur which would not be covered by the warranty.
1.
Place board in pit by means of crane or forklift, level back end of board with rear pit
angle, weld angles as shown on Drawing.
2.
Shim front end of board so as top deck of board is level with the rear angle.
3.
Weld front base and shims to front curb angle.
4.
With the board welded in the pit, remove bands; elevate deck by pulling release
chain at rear of dock.
5.
Block the board securely in the up position before working underneath the dock
board.
6.
Shim under back frame of the board and under the centre angle as shown on
drawing. Weld shims to the angles.
7.
Read operating instructions. Operate the board several times, pausing between
operation to expel the air in system.
NOTE:
WHILE THE DOCK BOARD IS FACTORY ADJUSTED, THEY MAY REQUIRE SLIGHT ADJUSTMENT ON
SITE DUE TO THE MOVEMENT IN SHIPPING AND DURING THE INSTALLATION.
THIS IS NOT WARRANTY.
We reserve the right to change specifications and/or design without notice or
obligation.
Please state model number of dock board when ordering parts.
- 3 -
80136 Mechanical Leveler:80136 Mechanical Leveler 11/19/08 10:52 AM Page 6
Perma Tech Inc.
Содержание MD-610
Страница 18: ......