Perlick BR48 Скачать руководство пользователя страница 4

4

Perlick is committed to continuous improvement. therefore, we reserve the right to change specifications without prior notice.

Preparing the Cabinet for Use

Form no. Z2278

rev. 05.06.10

Parts List 

  ■ 

(2) Shelves plus (1) Floor rack-per door.

  ■ 

Shelf Clips.

Suggested Tools 

  ■ 

 #2 Phillips Screwdriver.

  ■ 

10” Crescent Wrench.

  ■ 

9

/

16

” allen Wrench.

  ■ 

5

/

16

” and 

3

/

8

” hex Socket.

  ■ 

Power Drill or Driver. 

Plumbing 

Condensate from the cooling coil is automatically 
evaporated through a condensate pan located in the 
condensing unit housing. each unit is also equipped 
with a floor drain located in the right rear corner of 
the cabinet. the drain can be plumbed to an external 
floor drain by connecting to the 

3

4

” nPt thread out 

the side or the 1” nPS thread out the bottom. both 
drains ports come plugged from the factory and can 
be removed if needed.

NOTE:

remote units require evaporator condensate to be 
plumbed to an external drain. 

Electrical 

the cabinet must be connected to a separately 
fused power source (see electrical specification
plate) and grounded in accordance with national 
and Local electrical Codes. Caution: Do not
attempt to operate the equipment on any other 
power source than that listed on the electrical
Specification plate.

Uncrating and Inspection 

remove all crating material before operating. 
Carefully inspect cabinet for hidden damage. if
damage is discovered, file your claim immediately 
with the transportation company. Perlick is
not responsible for damage in transit.

Installing Casters and Legs 

(Optional)

 

attach four casters to the cabinet bottom; rigid cast-
ers at the rear and swivel casters on the front. Use 
the supplied 

1

/

4

”- 20 x 

3

/

4

” hex head self-tapping 

machine screws.

Placing the Cabinet 

Push the cabinet into place using rollers when  
necessary. 

Important:

 Proper air flow around the 

condensing unit is necessary for efficient operation. 
never obstruct the air flow in and out of the  
condensing unit.

For sanitation purposes, it may be necessary to 
seal the base of the cabinet to the floor. this can be 
accomplished by laying a bead of silicone sealant 
between the base of the cabinet and the floor as 
shown by  the figure at below.

Leveling the Cabinet 

When the cabinet is in place, check installation with 
carpenter’s level. When level front to back and left 
to right, accumulated water will drain out of cabinet 
evaporator drain.

Installing base Plate 

(Optional)

 

attach brackets to cabinet bottom in holes pro-
vided. attach base plate to brackets. (See separate 
instructions, provided with kit). When returning 
cabinet to upright position, be careful not to bend 
brackets.

WARNING! 

To avoid compressor damage, after returning  

cabinet to an upright position, let unit stand for  

24 hours before plugging it in and running the unit.

beaD SiLiCOn

SeaLer (rtV)

FLOOr

Cabinet

Содержание BR48

Страница 1: ...l then Service You will see the link to Warranty Registration Form You must complete and submit this form or the installation date will revert back to the ship Date This manual has been prepared to as...

Страница 2: ...ware Door handles Choice of full length stainless steel classic 6 black vinyl wrapped pull or top mounted stainless steel pull tab Lock finish chrome REFRIGERATION R 134a capillary tube type Aluminum...

Страница 3: ...Aluminum fin and copper tube evaporator epoxy coated coil Factory installed expansion valve Choice of R22 or R404A Copper tube connection stubbed out left side of evaporator assembly Suction line acc...

Страница 4: ...ing Carefully inspect cabinet for hidden damage If damage is discovered file your claim immediately with the transportation company Perlick is not responsible for damage in transit Installing Casters...

Страница 5: ...al strength commercial cleaner can be used to clean the outside of painted cabinets Cleaning the Condenser Use a long handled stiff brush to clean the dirt from the front surface of the condenser Keep...

Страница 6: ...65538 65539 65540 Wire harness mullion heater 65571 65572 65573 Light bulb 63821 63821 63821 Light bulb guard 65525 65525 65525 Light socket 63484 63484 63484 Light switch 65535 65535 65535 Lock 63762...

Страница 7: ...assemble lock rail from STEP 3 Operations to Perform on Door STEP 11 Remove bottom door hinge bracket from door assem bly and remove door hinge bushing from bracket Re assemble door hinge bracket to p...

Страница 8: ...TO CONDENSING UNIT MUST COMPLY WITH ALL LOCAL AND NATIONAL ELECTRICAL CODES CABINET JUNCTION BOX CONDENSING UNIT EVAPORATOR HOUSING GROUND WIRE JUNCTION BOX PRESSURE SWITCH FIELD INSTALLED POWER CONNE...

Отзывы: