24 . Peltier Temperature Programmer User’s Guide
Figure 5 Six cell holder with cover
2.
Remove the cover.
The cover must be refitted when the alignment procedure has been completed.
3.
Follow the instructions provided with the changer unit to install the six cell holder.
The side to which the flat cable will be connected must be placed towards the rear wall
of the sample compartment. This means the flat cable connector is at the back, and the
water flow connectors are at the front.
4.
Fix the flat cable to the six cell holder.
5.
Feed the flat cable to the bottom of the spectrometer through the slot at the rear of the
sample compartment.
6.
Install the unit in the sample compartment, according to the instructions.
Take care to avoid badly crimping the flat cable. Allow sufficient cable for the cell holder
to move in the changer unit but do not obstruct the light path.
7.
Connect the cable fed through the bottom of the spectrometer to the electronic control
unit (Figure 6).
Cover
screws
Содержание PTP-1
Страница 1: ...Peltier Temperature Programmer User s Guide...
Страница 5: ...Introduction...
Страница 10: ...10 Peltier Temperature Programmer User s Guide...
Страница 11: ...Warnings and Safety Information...
Страница 18: ...18 Peltier Temperature Programmer User s Guide...
Страница 19: ...Installation...
Страница 30: ...30 Peltier Temperature Programmer User s Guide...
Страница 31: ...Description...
Страница 36: ...36 Peltier Temperature Programmer User s Guide...
Страница 37: ...Operation...
Страница 47: ...Configuration and Maintenance...