Loading Sample Tubes
OMNI Bead tubes should be used exclusively with OMNI Bead Ruptor Homogenizers.
A minimum of four tubes are
required and must be spaced
evenly*.
Place Tube Carriage (sold
separately) on Drive Hub.
Place Finger Plate on Drive Hub.
Screw down to secure tubes.
Close the lid until the locking
handle clicks into place.
CAUTION: The unit will not run
without the lid fully closed.
WARNING: Do not run the Bead
Ruptor Elite
TM
Bead Mill without
a tube carriage installed.
2.
4.
5.
1.
3.
*
*