CTU MEGA 20 Diamagnetic Pump MOD07-2-5 Rev.13 of 28/08/2019
10
PERISO SA
2.2 Writing Conventions
Highlighted
Highlights certain parts of the document, where
important and particular attention is necessary.
Note
Notes that put in highlight important instructions for
specific uses.
Caution
These messages appear before the description of
operations which, if not observed, may cause damage to
the equipment or its accessories, and to people.
Forbidden
This message is placed before operations that must
never be carried out.
3. INSTALLATION
3.1 Installation Instructions
The CTU Mega 20 device must be extracted from the front of the box after removing the
safety locks. Then remove all accessories and check its integrity.
The device comes partially assembled, the only operations to be performed are:
x
Mount the arm
x
Assemble the electrodes shelf
x
Connect the cables
Attach the arm with the supplied screws: two
to attach it to the trolley (a) and one to
secure it to the electric motor (b).
a
b