![Peri MO-20-00445 0 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/peri/mo-20-00445-0/mo-20-00445-0_assembly-commissioning-and-maintenance-instructions_1529932027.webp)
27
RCS-2 Climbing Device and Hydraulics
Assembly Instructions
C1 Initial commissioning
Measures prior to initial commission-
ing
■
Check the completeness of the techni-
cal documentation, e.g. hydraulic con-
nection diagram, electronics connection
diagram, data cable connection dia-
gram, manufacturer’s assembly instruc-
tions.
■
Site personnel to familiarise themselves
with the equipment using the available
documentation.
■
Clean the bushings and clips of all
quick-couplers, and check for damage.
■
For more commissioning details, see
the manufacturer’s assembly instruc-
tions.
Standard assembly
1. Assemble or set up the pump, see
Section E1 “Connection diagram”.
2. Connect the hydraulic hoses.
3. Check the oil level of the pump, and fill
if necessary.
4. Attach the data connection cable.
5. Attach the power connection cable.
6. Connect remote control.
7. Attach the connection cable.
8. Check all fastenings and connections.
9. Power on the system and check the
rotary field on the keypad, see section
D4 “Climbing procedure”.
10. Do not install the hydraulic cylinder for
ventilation.
11. Ventilate system and check for leak-
age, see Section D7 “Remedial meas-
ures for malfunctions” and the manu-
facturer’s installation instructions.
12. Carry out any additional steps in the
manufacturer’s assembly instructions.
13. Install hydraulic cylinder.
14. Put the system into operation.
Содержание MO-20-00445 0
Страница 61: ...61 RCS 2 Climbing Device and Hydraulics Assembly Instructions ...
Страница 79: ......