RCS-2 Climbing Device and Hydraulics
Assembly Instructions
Introduction
Climbing procedure
Only anchor climbing units to the next
concreting section once the required con-
crete strength has been reached.
The moving process may create building
edges between the platforms. If work is
carried out in this area, site personnel
must be safeguarded against falling (e.g.
using rope protection). Cordon off areas
of risk.
Prior to the climbing procedure, platforms
must be cordoned off to prevent inadvert-
ent access.
During the moving procedure, neither per-
sons nor construction materials or tools
are allowed to be transported, with the
exception of operating personnel.
Monitor the engagement of the climbing
devices, the pawl of the climbing shoes
and the insertion into the climbing shoes.
When climbing with climbing hydraulics,
details regarding the arrangement of the
hydraulic hoses, data cables and power
cables must be taken into consideration.
Operational faults
■
Set down the platform in the next pos-
sible position and secure.
■
Leave the climbing unit via the safest
route.
■
Notify an authorised person immediate-
ly.
Maintenance and repairs
■
Only materials in perfect condition are
to be used.
■
Climbing system components are to be
checked for signs of damage by quali-
fied personnel on a regular basis. Dirt
which affects functionality is to be re-
moved immediately.
■
Damaged components should be in-
spected, removed and replaced.
■
In the case of recurrent damages, the
cause must be determined and recti-
fied.
PERI climbing hydraulics must not be
used if the type plate is missing, incom-
plete or illegible.