Pereko Q-per 12 Скачать руководство пользователя страница 4

4

Page

Operation and maintenance manual for the Q-PER series boilers with feeders. The producer reserves the right to introduce technical modifications.

2.  TECHNICAL DESCRIPTION

2.1.  Intended use

Steel heating boilers Q-PER are intended for installation in the 
central heating water systems in single-family houses, garag-
es, maintenance rooms etc. These boilers belong to a group of 
low-temperature boilers and are not subject to registration in 
the regional O

ffi

ce of Technical Inspection. They are intended for 

operation in water distribution piping of the gravity hot-water 

systems or in open systems with forced circulation, which are 
equipped with protections in compliance with the requirements 
PN-91/B-02413 applying to the protections of the open water 
heating system (considering the Regulation of the Minister of 
Infrastructure, Journal of Laws of 2009 no. 5 item 461).

2.2.  Transport and storage

Central heating boiler type Q-Per with feeding unit the fuel is 
delivered in assembled condition. All the set is foiled and placed 

on a transport pallet. The boiler should only be stored indoors 
roofed..

2.3.  Design description

2.3.1.  Water unit

Q-Per series heating boilers are made of P265GH grade steel 
sheet, suitable for construction of pressurised equipment, oper-
ating at higher temperatures.Heat exchanger panels are welded, 
while  the  unit  casing  is  reinforced  with  brackets.  Location  of 
convection ducts allows cleaning using the upper door. Ash and 
soot are removed through the bottom door.

2.3.2.  Doors

The boiler is equipped with upper door (in models with higher 
capacity, also middle door) used for cleaning and bottom door 
used for ignition and removal of ash produced in the combustion 
process.

2.3.3.  Water jacket

The water jacket is a space 

fi

lled with heating medium - water. 

The structure is made of steel sheet P265GH for pressure equip-
ment intended for operation at elevated temperature.

2.3.4.  Boiler casing

Casing panels are 

fi

xed to the boiler footing. The casing protects 

mechanical  components  and  has  a  decorative  function.  The 
panels are made of aesthetic powder-coated modules with high 
anti-corrosive resistance.

2.3.5.  Electronic controller

The microprocessor controller installed in the upper part of the 
boiler  allows  programming  the  working  temperature  of  the 
boiler. The controller is additionally equipped with the operation 
control and emergency shutdown sensor, switching the system 
o

ff

 when water temperature exceeds 95°C. See details in the 

“Microprocessor temperature controller operation manual” at-
tached to the boiler documentation.

2.3.6.  Fuel feeding system

Takes fuel from the hopper and ensures automatic feeding of the 
burner section, using a steel screw conveyor.

Содержание Q-per 12

Страница 1: ...Operation and maintenance manual for the boilers with feeder Q Per...

Страница 2: ...rameters of the controller 13 4 5 Fuel refilling 14 4 6 Boiler stopping 14 4 7 Cleaning and maintenance 14 4 8 Emergency stopping of the boiler 15 5 BOILER OPERATION DISTURBANCES BEFORE CALLINGTHE SER...

Страница 3: ...ciency of the boiler ensure continuous access to the equipment avoid exceeding water temperature in boiler over 95 C maintain operating pressure not exceeding 2 bar NOTE Boiler installation in accorda...

Страница 4: ...n of pressurised equipment oper atingathighertemperatures Heatexchangerpanelsarewelded while the unit casing is reinforced with brackets Location of convection ducts allows cleaning using the upper do...

Страница 5: ...aust flue is an integral part of the boiler extracting exhaust gas towards the flue duct 2 3 9 Exhaust gas swirlers Exhaustgasswirlersareinstalledinconvectionductstoswirlthe exhaustgasstream whichincr...

Страница 6: ...gas at nominal power C 160 150 Temp of flue gas at minimum power C 70 80 Flue gas mass flow at nominal power g s 5 93 8 42 11 62 16 14 Flue gas mass flow at minimum power g s 1 83 3 29 4 54 8 81 Fuel...

Страница 7: ...tmaximum1movertheflooringornotlowerthan 200 cm2 for boilers with power up to 25 kW or 400 cm2 for boilers over 25 kW 2 separate air exhaust duct on the internal wall with cross sectionnotlowerthan140...

Страница 8: ...recommended to use the connection at a straight angle because it will cause a loss in the chimney draught Fluewithchimneyshouldbejoinedwithaconnec tor made of steel sheet of thickness 3 mm to be purc...

Страница 9: ...reserves the right to introduce technical modifications Equalizing tank Non return ball valve Non return valve Central heating pump Pump Boiler Heaters Storage type water heater for domestic hot water...

Страница 10: ...thecentralheatingdesignmustbefollowed Asam ple scheme of boiler connection with the central heating and domestic hot water systems in an open heating system with gravitational or forced water circuit...

Страница 11: ...t and is synonymous with loss of the warranty Thesystemcanberefilledwithwateronlywhentheboileris cold Firing up should be restarted after filling the system 3 6 3 Draining water from the system It is...

Страница 12: ...pera tures resulting in risk of burn injuries Do not stay on the side of the boiler during the opening of the doors and pay attention to flames Take care of cleanness in the boiler room ensure proper...

Страница 13: ...hecombustionprocess is taken by the controller see Controller instruction manual that maintains the set water temperature in the boiler with ref erence to the heat demand of the building 4 4 Approxima...

Страница 14: ...utton then scrape the heat to the ash pan using the hook supplied along with the boiler 4 7 Cleaning and maintenance Keepingtheboilercleanisnecessaryforitsreliableandfaultless operation Even a thin la...

Страница 15: ...rbancesinboileroperation and methods of dealing with them Symptom Cause Repair Smoking outwards insufficient chimney draught remove leaks in chimney flue or boiler doors insufficient chimney height li...

Страница 16: ...onths and 24 months for the components 6 Warranty for tightness of welding joints is not synonymous with warranty for tightness of the whole boiler and is appli cable in case of leaks only on welding...

Страница 17: ...ompatible with PN 91 B 02413 2 Incorrect connection in closed system acc to the Journal of Laws of 2009 no 56 item 461 3 Incorrect transport and storage of the boiler 4 Starting the boiler without suf...

Страница 18: ...18 Page Operation and maintenance manual for the Q PER series boilers with feeders The producer reserves the right to introduce technical modifications SERVICE ASSISTANCE Date Comments Signature...

Страница 19: ...is provided for 10 years 60 months for tightness of the heat exchanger and 24 months for the other components The beginning of the warranty period for the PEREKO boiler is the date of purchase confir...

Страница 20: ...ducer Envo sp z o o 27 200 Starachowice ul Radomska 76 POLAND www grupaenvo pl Technical support tel 48 41 274 53 53 fax 48 41 274 53 26 e mail serwis pereko pl mobile 48 602 315 512 604 953 459 660 7...

Отзывы: