Operation and maintenance manual for the Q-PER series boilers with feeders. The producer reserves the right to introduce technical modifications.

3.4.2.  Closed water heating installations

The Q-PER boiler with automatic feeding may be used in closed 
water heating installations, provided that:
•  the system is equipped with a membrane expansion vessel,
•  a  heat  excess  extraction  device  (REGULUS  DBV  –  1  dual 

function cooling valve) is installed,

•  max. 2.5 bar safety valve is installed.

NOTE! These devices must be inspected at least twice a year. 
The 

fi

rst inspection must be conducted during the seasonal 

boiler start-up with the water heating installation.

3.4.3.  4-way valve

The design of the heating system must include boiler protection 
against return of excessively cold water from the installation. Use 
of 4-way mixing valve is recommended. It allows increasing the 
temperature of water returning to the boiler. The 4-way valve 

mixes warm water from the feeding circuit with colder water 
from the heating circuit return, and therefore:
•  protects the boiler against low-temperature corrosion and 

preliminary wear,

•  increases the e

ffi

ciency of heating of domestic water in the 

DHW tank,

•  allows 

fl

exible control of heating water temperature in rela-

tion with the heating system requirements,

•  increases the e

ffi

ciency of the entire system.

Design and installation of a heating system appropriate for a 

given building must be performed by properly quali

fi

ed persons. 

Central heating systems may be di

ff

erent, thus the guidelines 

included in the central heating design must be followed. A sam-
ple scheme of boiler connection with the central heating and 
domestic hot water systems in an open heating system with 
gravitational or forced water circuit is presented on page 13.

3.5.  Connection of the boiler to electrical system

Boiler  room  should  be  equipped  with  electrical  system  with 
rated voltage 230/50 Hz in compliance with the applicable reg-
ulations. The system should be terminated with plug-in socket 

equipped  with  protective  conductor  contact  with  connected 
protective  conductor  terminal  PE  to  protect  against  electric 
shock.

3.6.  Filling the system with water

3.6.1.  Filling the boiler with water 
before 

fi

rst start-up

1.  Flush heating system and boiler before 

fi

lling it with water to 

remove all contaminations.

2.  Fill the system with water through the drain cock using the 

fl

exible hose. Water intended for feeding the heating boil-

er  should  meet  the  requirements  of  the  PN-93/C-04607 
standard. Quality of water 

fi

lling the central heating system 

in

fl

uences its durability therefore this water should be free 

from the contaminations, oil and aggressive chemical sub-
stances. Water hardness should not exceed 2-4 (mval/l). Too 

hard water causes deposition of sediment in the boiler and 
heating system what decreases e

ffi

ciency and may damage 

the boiler.

3.  Stop feeding of water when the system is full that is water 

will  start 

fl

owing  out  from  the  signalling  pipe  of  the  ex-

pansion vessel located in the highest point of the system 
or when the pressure gauge indicates 5 bar. Re

fi

lling should 

take several seconds to make sure that the water 

fl

ows down 

from the vessel.

4.  Close boiler drain cock and disconnect 

fl

exible hose from the 

equipment when the system is 

fi

lled.

Содержание Q-per 12

Страница 1: ...Operation and maintenance manual for the boilers with feeder Q Per...

Страница 2: ...rameters of the controller 13 4 5 Fuel refilling 14 4 6 Boiler stopping 14 4 7 Cleaning and maintenance 14 4 8 Emergency stopping of the boiler 15 5 BOILER OPERATION DISTURBANCES BEFORE CALLINGTHE SER...

Страница 3: ...ciency of the boiler ensure continuous access to the equipment avoid exceeding water temperature in boiler over 95 C maintain operating pressure not exceeding 2 bar NOTE Boiler installation in accorda...

Страница 4: ...n of pressurised equipment oper atingathighertemperatures Heatexchangerpanelsarewelded while the unit casing is reinforced with brackets Location of convection ducts allows cleaning using the upper do...

Страница 5: ...aust flue is an integral part of the boiler extracting exhaust gas towards the flue duct 2 3 9 Exhaust gas swirlers Exhaustgasswirlersareinstalledinconvectionductstoswirlthe exhaustgasstream whichincr...

Страница 6: ...gas at nominal power C 160 150 Temp of flue gas at minimum power C 70 80 Flue gas mass flow at nominal power g s 5 93 8 42 11 62 16 14 Flue gas mass flow at minimum power g s 1 83 3 29 4 54 8 81 Fuel...

Страница 7: ...tmaximum1movertheflooringornotlowerthan 200 cm2 for boilers with power up to 25 kW or 400 cm2 for boilers over 25 kW 2 separate air exhaust duct on the internal wall with cross sectionnotlowerthan140...

Страница 8: ...recommended to use the connection at a straight angle because it will cause a loss in the chimney draught Fluewithchimneyshouldbejoinedwithaconnec tor made of steel sheet of thickness 3 mm to be purc...

Страница 9: ...reserves the right to introduce technical modifications Equalizing tank Non return ball valve Non return valve Central heating pump Pump Boiler Heaters Storage type water heater for domestic hot water...

Страница 10: ...thecentralheatingdesignmustbefollowed Asam ple scheme of boiler connection with the central heating and domestic hot water systems in an open heating system with gravitational or forced water circuit...

Страница 11: ...t and is synonymous with loss of the warranty Thesystemcanberefilledwithwateronlywhentheboileris cold Firing up should be restarted after filling the system 3 6 3 Draining water from the system It is...

Страница 12: ...pera tures resulting in risk of burn injuries Do not stay on the side of the boiler during the opening of the doors and pay attention to flames Take care of cleanness in the boiler room ensure proper...

Страница 13: ...hecombustionprocess is taken by the controller see Controller instruction manual that maintains the set water temperature in the boiler with ref erence to the heat demand of the building 4 4 Approxima...

Страница 14: ...utton then scrape the heat to the ash pan using the hook supplied along with the boiler 4 7 Cleaning and maintenance Keepingtheboilercleanisnecessaryforitsreliableandfaultless operation Even a thin la...

Страница 15: ...rbancesinboileroperation and methods of dealing with them Symptom Cause Repair Smoking outwards insufficient chimney draught remove leaks in chimney flue or boiler doors insufficient chimney height li...

Страница 16: ...onths and 24 months for the components 6 Warranty for tightness of welding joints is not synonymous with warranty for tightness of the whole boiler and is appli cable in case of leaks only on welding...

Страница 17: ...ompatible with PN 91 B 02413 2 Incorrect connection in closed system acc to the Journal of Laws of 2009 no 56 item 461 3 Incorrect transport and storage of the boiler 4 Starting the boiler without suf...

Страница 18: ...18 Page Operation and maintenance manual for the Q PER series boilers with feeders The producer reserves the right to introduce technical modifications SERVICE ASSISTANCE Date Comments Signature...

Страница 19: ...is provided for 10 years 60 months for tightness of the heat exchanger and 24 months for the other components The beginning of the warranty period for the PEREKO boiler is the date of purchase confir...

Страница 20: ...ducer Envo sp z o o 27 200 Starachowice ul Radomska 76 POLAND www grupaenvo pl Technical support tel 48 41 274 53 53 fax 48 41 274 53 26 e mail serwis pereko pl mobile 48 602 315 512 604 953 459 660 7...

Отзывы: