Percussion Play Soprano Quartet Скачать руководство пользователя страница 9

Insert M10x 200 Threaded
bar into pre drilled holes
in Ground Fixing Post

Fix M10x 200 Threaded
bar in place using M10
Nuts

Excavate 11 holes with a

250mm diameter tapering
down to 350mm diameter
and 650mm depth

Compact base of hole with

50mm of aggregate.
Lower ground Fix post

attached to instrument

into hole (check
instrument straight and
level before filling with

concrete)

Fix hole with fast drying

concrete to manufacturers
specifications.

Locate the Ground fix Post
into the leg of the
instrument.

Fix instrument to Ground

fix post using M10 bolt
and Barrel Nut and use

thread locking solution

to prevent fixings working

loose.

650

50

350

250

Aggregate

Concrete

Ground Fixed

Ground Fix Post Installation

(1.1)

1

2

3

5

6

600mm max depth

7

4

M10x200 Threaded Bar

x4 

M10 BZP Nut

x8 

M10 Barrel Nut

x2 

M10x70 Security Screw

x2 

Components:

Ground fix tube  

protrudes 300mm from 

ground surface that 

inserts into the base of 

the chime post

TX 45  Driver Bit

Tools:

x2 

BS EN 1176

Thread Lock Solution 
Required (Not Supplied)

Thread Lock Solution 
Required (Not Supplied)

Foundations should not present a hazard. These foundations are recommended 

as a guide, for more information on foundation details for various surface see 

Part 7 of BS EN 1176.

Metric Conversion:

50mm/ 2”

100mm/ 4”

250mm/ 10”

350mm/ 14”

600mm/ 24”

650mm/ 26”

Freechimes

Alto/ Soprano

Page 3 of  4

Содержание Soprano Quartet

Страница 1: ...nufactures guidelines 3 Excavate 1 hole for the Steel legs 250mm diameter by 400 550mm deep depending on Key stage in desired location upon decision from customer 4 Locate lower legs into holes making...

Страница 2: ...M10 Nut x4 Ground Fix Components 14 Kg Pair Small Red Beaters X1 Cadenza Page 2 of 3 BS EN 1176 Thread Lock Solution Required Not Supplied Thread Lock Solution Required Not Supplied Instrument Compone...

Страница 3: ...50 250 Aggregate Concrete Excavate a hole with a 250mm diameter tapering down to 350mm diameter and 350mm depth Compact base of hole with 50mm of aggregate Lower ground Fix post attached of instrument...

Страница 4: ...urface to prevent marking of polished stainless steel 3 Align holes on legs opposite end to polished domes and secure in place using 3no M10 x 200mm threaded bar and 6no M10 nuts provided Tools requir...

Страница 5: ...eaded bar x3 M10 BZP Nut x6 Ground Fix Components 22 Kg 13 4 Kg BS EN 1176 Spares available form percussionplay com or from your local distributor M8x25mm Pin Torx x3 1 2 3 Thread Lock Solution Requir...

Страница 6: ...e filling with concrete Fill hole with fast drying concrete to manufacturers specifications 400 50 If Drum needs to be positioned lower a deeper hole can be excavated Ground Fixed Ground Fix Installat...

Страница 7: ...tallation Instructions 5 Once happy with location and levels fill holes using rapid hardening concrete Be sure to compact concrete around legs and leave to dry according to manufactures guidelines 6 B...

Страница 8: ...oprano Page 2 of 4 Pair Small Beaters X1 TX 30 Driver Bit x1 TX 45 Driver Bit x1 Tools Components M6x20mm Secure Screw X4 Eye Straps X2 M10x50mm Secure Screw X4 Ground Fix Components Thread Lock Solut...

Страница 9: ...and use thread locking solution to prevent fixings working loose 650 50 350 250 Aggregate Concrete Ground Fixed Ground Fix Post Installation 1 1 1 2 3 5 6 600mm max depth 7 4 M10x200 Threaded Bar x4 M...

Страница 10: ...sing 8x70mm screws supplied Fill holes with fast drying concrete to manufacturers specifications If posts protrude above instrument they can be cut down 650 350 250 50 600 Ground Fix Installation 1 1...

Страница 11: ...y screws square washers and PU mounts 1 1 See Assembly Guide 300mm Ground Surface S M L Small 800mm Medium 800mm Large 800mm Installation Instructions 1 1 1 2 Instrument Components M10x50 Security Scr...

Страница 12: ...Ground Fix Components M10x30 Security Screw x4 M10x50x3 Square washer x4 M10x200 Bolt x2 M10 Nut x4 PU 200 Mount PU 250 Mount x2 x2 Played with hands Congas Page 2 of 3 TX 45 Driver Bit Tools x1 BS EN...

Страница 13: ...base of hole with 50mm of aggregate Lower ground Fix post attached of instrument into hole check instrument straight and level before filling with concrete Ground Fixed Components Ground Fix Post Ins...

Отзывы: