Percussion Play Soprano Quartet Скачать руководство пользователя страница 6

250

4

50

350

Insert M10x 200 Threaded
bar into pre drilled holes
in Frame of Babel Drum
using M10 BZP Nuts

Excavate a holes with a
250mm diameter tapering
down to 350mm diameter
and 450mm depth

Compact base of hole with
50mm of aggregate.
Lower ground Fix post
attached to instrument
into hole (check
instrument straight and
level before filling with
concrete)

Fill hole with fast drying

concrete to manufacturers

specifications.

400

50

If Drum needs to
be positioned
lower a deeper
hole can be
excavated.

Ground Fixed

Ground Fix Installation

(1.1)

1

2

3

4

Babel Drum

Page 3 of 3

M10x200 Threaded Bar

x3 

M10 BZP Nut

x6 

Components:

BS EN 1176

Foundations should not present a hazard. These foundations are recommended as a guide, 

for more information on foundation details for various surface see Part 7 of BS EN 1176.

Metric Conversion:

50mm/ 2”

250mm/ 10”

350mm/ 14”

400mm/ 16”

450mm/ 18”

Содержание Soprano Quartet

Страница 1: ...nufactures guidelines 3 Excavate 1 hole for the Steel legs 250mm diameter by 400 550mm deep depending on Key stage in desired location upon decision from customer 4 Locate lower legs into holes making...

Страница 2: ...M10 Nut x4 Ground Fix Components 14 Kg Pair Small Red Beaters X1 Cadenza Page 2 of 3 BS EN 1176 Thread Lock Solution Required Not Supplied Thread Lock Solution Required Not Supplied Instrument Compone...

Страница 3: ...50 250 Aggregate Concrete Excavate a hole with a 250mm diameter tapering down to 350mm diameter and 350mm depth Compact base of hole with 50mm of aggregate Lower ground Fix post attached of instrument...

Страница 4: ...urface to prevent marking of polished stainless steel 3 Align holes on legs opposite end to polished domes and secure in place using 3no M10 x 200mm threaded bar and 6no M10 nuts provided Tools requir...

Страница 5: ...eaded bar x3 M10 BZP Nut x6 Ground Fix Components 22 Kg 13 4 Kg BS EN 1176 Spares available form percussionplay com or from your local distributor M8x25mm Pin Torx x3 1 2 3 Thread Lock Solution Requir...

Страница 6: ...e filling with concrete Fill hole with fast drying concrete to manufacturers specifications 400 50 If Drum needs to be positioned lower a deeper hole can be excavated Ground Fixed Ground Fix Installat...

Страница 7: ...tallation Instructions 5 Once happy with location and levels fill holes using rapid hardening concrete Be sure to compact concrete around legs and leave to dry according to manufactures guidelines 6 B...

Страница 8: ...oprano Page 2 of 4 Pair Small Beaters X1 TX 30 Driver Bit x1 TX 45 Driver Bit x1 Tools Components M6x20mm Secure Screw X4 Eye Straps X2 M10x50mm Secure Screw X4 Ground Fix Components Thread Lock Solut...

Страница 9: ...and use thread locking solution to prevent fixings working loose 650 50 350 250 Aggregate Concrete Ground Fixed Ground Fix Post Installation 1 1 1 2 3 5 6 600mm max depth 7 4 M10x200 Threaded Bar x4 M...

Страница 10: ...sing 8x70mm screws supplied Fill holes with fast drying concrete to manufacturers specifications If posts protrude above instrument they can be cut down 650 350 250 50 600 Ground Fix Installation 1 1...

Страница 11: ...y screws square washers and PU mounts 1 1 See Assembly Guide 300mm Ground Surface S M L Small 800mm Medium 800mm Large 800mm Installation Instructions 1 1 1 2 Instrument Components M10x50 Security Scr...

Страница 12: ...Ground Fix Components M10x30 Security Screw x4 M10x50x3 Square washer x4 M10x200 Bolt x2 M10 Nut x4 PU 200 Mount PU 250 Mount x2 x2 Played with hands Congas Page 2 of 3 TX 45 Driver Bit Tools x1 BS EN...

Страница 13: ...base of hole with 50mm of aggregate Lower ground Fix post attached of instrument into hole check instrument straight and level before filling with concrete Ground Fixed Components Ground Fix Post Ins...

Отзывы: