Assembly & Operation Manual
Figure 16. Design and layout of holes for MT10.3 mounting post
c. Installation procedure for the
MT10.3
mounting rack (for the
TTR-10AB
modification) (Fig. 16):
Detach the post front panel by unscrewing the two bottom screws.
Mark and make holes in the floor for anchor bolts to secure the post, route the cable duct
to the cable entry area. Marking can also be done directly on the base of the mounting
post.
Route the cables through the cable duct to the entry area, the length of cable stock should
be at least 1.3 meters.
22
Содержание TTR-10A Series
Страница 26: ...TTR 10A electromechanical tripod turnstile Figure 17 Connection layout 25 ...
Страница 34: ...www perco com ...