
Instruction Manual peqPOWER 250 Volt Power Supply
OPERATIONAL KEYS
Key Functions
STOP key: Used to stop operation from the Running Screen
START/PAUSE key: Used to start operation / temporarily interrupt power to an
operation in progress without terminating electrophoresis and to resume power
after pausing without resetting the timer
CONSTANT key: Used to set up constant voltage or current values
MODE key: Used to choose either Constant Voltage, Constant Current or Constant
Wattage mode
Down Arrow key: Used to move cursor down between parameters and to decrease
numeric values
Up Arrow key: Used to move cursor up between parameters and to increase nu-
meric values
STOP
START
PAUSE
CONSTANT
MODE
GETTING STARTED
Installing the peqPOWER 250 Volt Power Supply
1.
Check the label located near the AC inlet to ensure that the unit is compatible with locally pro-
vided voltage.
2.
Place the peqPOWER 250 Volt Power Supply on a level laboratory bench. Keep the area
around the power supply clear to ensure proper ventilation of the unit.
3.
For your safety: Position the unit properly such that the On-Off switch and the AC inlet located
on the rear of the unit are easily accessible.
4.
Ensure the AC power switch is in the Off position.
5.
Attach the power cord to the AC inlet. Use only properly grounded AC outlets and power cords.
6.
Connect the leads from the electrophoresis unit; insert the red lead (+) into the red output jack,
and the black lead (-) into the black output jack.
PEQLAB_v0412E
6