![Pepperl+Fuchs WCS-ECG410 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/pepperl-fuchs/wcs-ecg410/wcs-ecg410_manual_1527705017.webp)
2
0
2
0
-0
3
16
Commissioning
Connecting the Interface Module
To ensure that the assembly functions correctly, you must carry out the following steps during
commissioning:
1.
Assign an EtherCAT address.
2.
Assign an EtherCAT device name.
3.
Connect the module to the EtherCAT network on the interface labeled "In" (cable from master)
or "Out" (further cable to the next slave).
4.
Connect the process device (read head) to the interface module. For information on
commissioning the read head, please refer to the instruction manual for the read head.
5.
Ground the DIN mounting rail onto which the assembly is clipped.
6.
Connect the direct current to the terminals provided.
7.
Use any programming tool for project planning. The ESI file can be downloaded from our
website: www.pepperl-fuchs.com. Simply enter the product name or item number in the
product/keyword field and click "Search."
Note
On delivery, the module does not yet have an IP address. In normal operation,
the IP address is usually assigned to the module by the EtherCAT IO controller
(PLC).
Note
On delivery, the module does not yet have a device name. The device name is
assigned to the module via the project planning software.
Note
A more detailed description of the individual steps is provided on the following
pages.