operating sequence

Class II pressurization operation

 

With the inert gas supply connected, enclosure power 
deenergized and alarm system energized (if utilized) . . 

1.    Carefully  read  Start-Up  Instruction  Nameplate  on 

system.

2.    Check operation of the Enclosure Protection Vent (EPV-1, 

if utilized), opening it manually several times, (see page 
17, “Helpful Hint”).

3.   Remove all traces of combustible dust.

4.    Seal protected enclosure(s).

5.   Open Enclosure Pressure Control Regulator by turning 

CW  to  set  Enclosure  Pressure  Indicator  at  “Safe” 
pressure,  the Pressure Loss Alarm Switch should then 
activate to silence the alarm system (if utilized).

6.   Ensure  the  Protection  System  Enclosure  Pressure 

Indicator  maintains  a  “Safe”  pressure  for  one  (1) 
minute.

7.  Energize the protected enclosure power.

8.  Ensure the Enclosure Pressure Indicator maintains a “Safe” 

pressure before leaving system unattended.

Model 1001a-lps 

Front View

 

Class I purging operation

With  the  inert  gas  supply  connected,  enclosure  power 
deenergized and alarm system energized (if utilized). 

1.    Carefully  read  Start-Up  Instruction  Nameplate  on 

system.

2.    Check operation of the Enclosure Protection Vent (EPV-1, 

if utilized), opening it manually several times, (see page 
17, “Helpful Hint”).

3.   Seal protected enclosure(s).

4.   Open Enclosure Pressure Control Regulator, by turning 

CW,  to  set  Enclosure  Pressure  Indicator  at  “Safe” 
pressure, the Pressure Loss Alarm Switch should then 
activate to silence the alarm system (if utilized).

5.   Ensure  the  Protection  System  Enclosure  Pressure 

Indicator  maintains  a  “Safe”  pressure  for  one  (1) 
minute.

6.   Standby  for  the  exchange  time  as  specified  on  the 

Instruction  Nameplate,  then  energize  the  protected 
enclosure power.

7.  Ensure the Enclosure Pressure Indicator maintains a “Safe” 

pressure before leaving system unattended.

Enclosure

pressure

Control

Regulator

start - Up 

Instruction 
nameplate

Enclosure 

pressure 

Gauge

Model Iden-

tification 

nameplate

WaRnInG

Do not exceed a “safe” pressure with the Enclosure pressure Control Regulator.

operators must follow step-by-step sequence of the start-Up Instructions nameplate on the protection system.

RSPSupply  -  1-888-532-2706 -  www.RSPSupply.com

http://www.RSPSupply.com/p-6798-Hoffman-A1001YZUMC2-Purging-Pressurization-System-10-CF.aspx

Содержание 1001A Series

Страница 1: ...cessories Supplied with Each Kit Pentair Technical Products 2100 Hoffman Way Anoka Minnesota 55303 PH 763 422 2211 hoffmanonline com Hoffman P N 87571946 Manufactured by 1600 Enterprise Parkway Twinsb...

Страница 2: ...subject to change without notice Table of Contents Page 2 System Purpose and Description Purpose System Description Important Notes Page 3 Identifying Your System Defines specific features of the syst...

Страница 3: ...ion proof differential pressure switch used to detect loss of safe enclosure pressure LPS Less Pressure Switch SYSTEM TYPE Type Z Reduces the internal enclosure area Division rating from Division 2 to...

Страница 4: ...re Warning Nameplate Silkscreened SS Recommended Spare Parts Qty Description Part supercedes 1 Enclosure Pressure Indicator CI 510023 1 Enclosure Pressure Indicator CII 513235 1 Enclosure Pressure Con...

Страница 5: ...Calculation 1 The total volume of all pressurized enclosures devices and wireways must be considered 2 All enclosure device and wireway volumes must be calculated without consideration of internally...

Страница 6: ...SERVICE VALVE SYSTEM SUPPLY FITTING ENCLOSURE PROTECTION SYSTEM SYSTEM MOUNTING BOLT ENCLOSURE SUPPLY TUBING ENCLOSURE PROTECTION VENT optional PROTECTED ENCLOSURE ENCLOSURE CONNECTION FITTINGS ENCLOS...

Страница 7: ...OUTLET OUTLET B TYPICAL MULTIPLE PROTECTED ENCLOSURE CONNECTIONS 1 2 PROTECTIVE GAS SUPPLY HEADER A A D C Connections for Lighter than Air Gases and Vapors HELPFUL HINTS If flammable gases are lighte...

Страница 8: ...ions are intended for mounting adjacent to the protected enclosure LH RH TM BM configurations are also suitable for 2 schedule 40 pipe mounting In addition these configurations can be accessorized wit...

Страница 9: ...LLED IN LINE FILTER KIT ACCESSORY Provides an 8 5 oz capacity 40 micron protective gas supply filter factory installed on the inlet side of the enclosure pressure control regulator Typical Surface Mou...

Страница 10: ...10 10 Mounting Plate Dimensions Model 1001A Face Plate 9 8 9 8 RSPSupply 1 888 532 2706 www RSPSupply com http www RSPSupply com p 6798 Hoffman A1001YZUMC2 Purging Pressurization System 10 CF aspx...

Страница 11: ...25 TYP 4 Flange Depth 6 3 375 1 1 0 675 0 5 Universal Flange Footprint Optional Wall Flange Footprint only available from Pepperl Fuchs RSPSupply 1 888 532 2706 www RSPSupply com http www RSPSupply c...

Страница 12: ...cted enclosure The length of time required is determined by the customer and can be factory or field engraved All EWNs and ETWs are furnished with an adhesive back but should also be riveted or screwe...

Страница 13: ...odel ILFK accessory See photo on page 9 One 1 Similar fitting which will connect the inert gas supply tubing to the inert gas supply header connection point and one 1 lot of 1 4 O D 035 wall thickness...

Страница 14: ...closure protection system whenever possible For systems protecting multiple enclosures in series the enclosure reference connection fitting must be placed on the last enclosure in the series see page...

Страница 15: ...nections are bolded System Supply Venturi Orifice Inlet Enclosure Pressure Gauge Regulator Sintered Vent Reference Supply Enclosure Reference Bulkhead fitting Enclosure Supply Bulkhead fitting System...

Страница 16: ...or 500 3 as required and all relevant plant and local codes Note Do not use seals on conduit used as a protected wireway to supply protective gas to adjacent protected enclosures The same conduit can...

Страница 17: ...ocked position upon arrival To adjust regulator pull handle to outward position 1 Close the Enclosure Pressure Control Regulator fully by turning counterclockwise CCW 2 Temporarily connect the inert g...

Страница 18: ...ed if utilized 1 Carefully read Start Up Instruction Nameplate on system 2 CheckoperationoftheEnclosureProtectionVent EPV 1 if utilized opening it manually several times see page 17 Helpful Hint 3 Sea...

Страница 19: ...osure Remove the orifice cut off the crimped end and ream the tube then recrimp and reinstall the tube to note effect As tube is shortened reamed andrecrimped sensitivitydecreases allowingeasieradjust...

Страница 20: ...O THE PRODUCTS IT IS EXPRESSLY AGREED AND UNDERSTOOD THAT P F MAKES NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE EXCEPT FOR THE LIMITED WARRANTY SET FORTH HEREIN THERE IS NO OTHE...

Страница 21: ...ing to the set up procedure and operating sequence on pages 17 and 18 Replace or tighten stem packing nut as required to prohibit stem packing leakage Carefully disassemble the enclosure protection ve...

Страница 22: ...22 22 CUSTOMER NOTES RSPSupply 1 888 532 2706 www RSPSupply com http www RSPSupply com p 6798 Hoffman A1001YZUMC2 Purging Pressurization System 10 CF aspx...

Страница 23: ...23 23 CUSTOMER NOTES RSPSupply 1 888 532 2706 www RSPSupply com http www RSPSupply com p 6798 Hoffman A1001YZUMC2 Purging Pressurization System 10 CF aspx...

Страница 24: ...omer Project Service Type Features Application SYSTEMS IDENTIFICATION APPLICATION INFORMATION Local Sales Representative NOTES RSPSupply 1 888 532 2706 www RSPSupply com http www RSPSupply com p 6798...

Отзывы: