PENTALIFT EQUIPMENT CORPORATION
M065R27
August 30, 2021 1:39 PM
ULTRAHOOK UHR40 VEHICLE RESTRAINT
BEFORE DOING ANY INSTALLATION, MAINTENANCE, INSPECTION OR TROUBLE
SHOOTING, BARRICADE ALL AREAS FROM TRAFFIC AROUND THE WORK AREA
INSIDE (AND OUTSIDE IF APPLICABLE) FOR SAFETY AND POST APPROPRIATE
WARNING SIGNS.
ARC FLASH AND SHOCK HAZARD PPE (PERSONAL PROTECTION EQUIPMENT)
REQUIRED. DE-ENERGIZE EQUIPMENT BEFORE WORKING ON OR INSIDE. DO
NOT OPEN COVER WITHOUT APPROPRIATE PPE. REFER TO NFPA 70E FOR PPE
REQUIREMENTS. THIS PANEL MAY CONTAIN MORE THAN ONE POWER SOURCE.
HAZARDOUS VOLTAGE WILL CAUSE SEVERE INJURY OR DEATH.
BEFORE DOING ANY ELECTRICAL WORK, BE CERTAIN THAT THE POWER IS
DISCONNECTED WITH A FUSED DISCONNECT, PROPERLY TAGGED AND LOCKED
OUT. FUSED DISCONNECT AND LOCKOUT DEVICE (SUPPLIED AND INSTALLED
BY OTHERS) MUST MEET WITH ALL APPLICABLE CODES AND REGULATIONS.
ALL ELECTRICAL WORK MUST BE PERFORMED BY A QUALIFIED ELECTRICIAN IN
ACCORDANCE WITH ALL APPLICABLE CODES AND REGULATIONS.
BE SURE ALL HYDRAULIC FITTINGS ARE RATED FOR HYDRAULIC SYSTEMS THAT
MAY PEAK OUT AT 4000PSI. HARDWARE STORE ITEMS CAN BURST AT 150PSI. ONLY
BUY REPLACEMENT PARTS FROM PENTALIFT.
INSTALLATION INSTRUCTIONS
DO NOT INSTALL, OPERATE OR SERVICE THIS PRODUCT UNLESS YOU HAVE READ
AND FULLY UNDERSTAND THE ENTIRE CONTENTS OF THIS MANUAL. FAILURE TO
DO SO MAY RESULT IN PROPERTY DAMAGE, BODILY INJURY OR DEATH.
IMPORTANT
PREPARATION PRIOR TO INSTALLATION
Follow all installation instructions in the precise consecutive order that they are written. If the equipment
cannot be installed in the order as outlined below, contact Pentalift Equipment Corporation for written
instructions on how to proceed. Do not proceed with an alternate installation method unless written
confi rmation has been provided by Pentalift Equipment Corporation.To accommodate a complete
installation there is a blank space provided beside each numbered step in the installation instructions.
Please check off the steps sequentially as they are completed. This will assist in confi rming a complete
installation.
MAKE SURE LIFTING AND SLINGING DEVICES ARE OF SUFFICIENT CAPACITY,
USED IN THE CORRECT MANNER AND ARE IN GOOD WORKING ORDER. ALL LIFT-
ING, POSITIONING AND INSTALLATION, AS WELL AS THE BREAK-IN AND PERFOR-
MANCE CHECK MUST BE DONE BY QUALIFIED PERSONNEL TRAINED AND EXPE-
RIENCED IN NECESSARY SAFETY PROCEDURES.
NOTE:
A very high level of fi eld issues with this type of equipment can be directly attributed to improper or incomplete
installation. The installation instructions and information provided for this equipment is thorough. A step by step
sequence for installation is provided. All steps must be followed and completed to provide a complete installation.
Incomplete or improper installations can lead to equipment malfunction and / or damage, create safety issues and
void warranties. Please follow all installation and set ups steps as indicated in the installation instructions and owner’s
manual. If you are unclear or uncertain regarding any of the steps contact your Pentalift representative for clarifi cation.
A copy of the completed steps listing with the sign off and photos of the installation as indicated at the conclusion of the
installation instructions will be required prior to any Pentalift factory trouble shooting assistance.
IT IS THE RESPONSIBILITY OF OTHERS TO ENSURE THE PROPER MOUNTING OF ANY
WALL MOUNTED EQUIPMENT SUCH AS REMOTE POWER UNITS, CONTROL PANELS
AND LIGHT PACKAGES AND TO ENSURE THAT THE MOUNTING SURFACE IS CAPABLE
OF FULLY SUPPORTING THE LOADS GENERATED BY THE EQUIPMENT.