3
DYNA-PRO
®
Self-Priming Pool/Spa Pump Installation and User’s Guide
BONDING
LUG
GROUND
SCREW
1/2” NPT RECEPTACLE
FOR LIQUID TIGHT
CONNECTOR
MOTOR SHAFT
FLATS FOR 1/2”
WRENCH
Figure 3
Electrical Installation
Wiring
1. Be sure all electrical breakers, switches and automatic
controls are turned off before wiring motor.
2. Become familiar with the wiring diagram, volts, hertz,
amps and phase of your particular pump motor. All of
this information is provided on the motor nameplate label
found on the side of the motor.
3. Be sure that the supply voltage meets the requirements
listed on the motor nameplate. If these requirements are
not met, permanent motor damage may occur.
4. For wiring sizes and general guidelines for proper electrical
installation, please follow the specifications defined in
the National Electrical Code and all other applicable
national or local codes.
5. 3-Phase motors require external overload protection.
An initial inspection is needed to ensure proper rotation
of the pump.
Once installed, momentarily cycle the power on and
then off. Note the rotation of the motor fan or shaft as it
comes to a stop. If wired correctly the motor shaft and/
or fan will match the rotation arrow noted on the pump.
6. Use a strain relief and be sure all electrical connections
are clean and tight.
7. Cut the wires to the appropriate length so they do not
overlap or touch when connected.
Grounding
1. Permanently ground the motor using the green ground
screw, as shown below. Use the correct wire size and
type specified by National Electrical Code. Be sure the
ground wire is connected to an electrical service ground.
2. The pump should be permanently connected to either a
circuit breaker, 2-pole timer or 2-pole relay.
Note:
If AC power is supplied by a GFCI circuit breaker,
the pump should be wired on its own independent circuit
unless the pump is operated in tandem with a Pentair
salt chlorine generator.
Bonding
1. Bond the motor to the structure in accordance with the
National Electrical Code and all other applicable national
or local codes. Use a solid copper bonding conductor
not smaller than 8 AWG. For Canadian installations, a 6
AWG or larger solid copper bonding conductor is required.
Run a wire from the external bonding screw or lug to the
bonding structure.
2. Connect the wire from the accessible bonding lug on the
motor to all metal parts of the swimming pool, spa, or
hot tub structure and to all electrical equipment, metal
conduit, and metal piping within 5 feet (1.52 meters) of
the inside walls of the swimming pool, spa, or hot tub.
Run a wire from the external bonding screw or lug to the
bonding structure.
Section P/N 350486 Rev. C 8/24/17
Before establishing or restoring power to the
pump, be sure all electrical connections are tight
and all electrical and wiring compartment covers are properly installed.
RISK OF ELECTRICAL SHOCK OR ELECTROCUTION.
This pump must be installed by a licensed or certified electrician or a qualified
service professional in accordance with the National Electrical Code (NEC) and all other applicable national or local codes and ordinances.
Improper installation will create an electrical hazard which could result in death or serious injury to users, installers, or others due to electrical
shock, and may also cause damage to property.
Always disconnect power to the pump at the circuit breaker before servicing the pump. Failure to do so could result in death or
serious injury to service people, users or others due to electric shock.
Read all servicing instructions before working on the pump.
Note:
When the pump is started and stopped by removing
power with a relay or timer, a two-pole device should be
used to apply and remove power to both POWER LINE
TERMINALS.
Pentair offers GFCI breakers which offer appropriate
personal protection while meeting 2008 to current NEC
Standards for Pool Pumps. See Pentair product catalog for
details.
STORED CHARGE
- Wait at least sixty (60)
seconds before servicing.
Содержание STA-RITE DYNA-PRO
Страница 15: ...NOTES...