background image

©2019 Pentair plc.   I

  

 13

Pentair Pentek Solar Drive Operation

If the motor is properly connected, the Pentair Pentek Solar 
Drive will begin the startup procedure. The green AC LOAD 
LED (Figure 13) will have a solid green light, and the motor will 
start running. Additionally, the Pentair Pentek Solar Drive will 
immediately start performing MPPT operation over the solar 
PV source. The MPPT operating range is 45 to 60Hz for 60Hz 
rated motors, or 40 to 50Hz for 50Hz rated motors.

The Pentair Pentek Solar Drive has built-in overload 
protection, so if a connected motor has a power level higher 
than the Pentair Pentek Solar Drive limitations, it first slows 
down and tries to run the motor at a lower power level. If 
the motor power continues to be outside the power range 
of the Pentair Pentek Solar Drive, it will shut off the motor 
operation. If there is not enough solar power, the unit’s 
SOLAR LED light will blink yellow, as shown in Figure 14. 
This usually happens in the early morning or late evening, 
or during overcast weather. The Pentair Pentek Solar Drive 
controller will try to start the motor once every minute with 
increasing time between start attempts. Each attempt will 
be indicated by the blinking green LED. If there is not enough 
solar production from the solar panels, the yellow LED will 
start blinking again.

Shutdown:

To stop the Pentair Pentek Solar Drive’s operation, the DC Disconnect should be used.  
Once in the OFF position, the Pentair Pentek Solar Drive will automatically stop the  
motor’s operation. 

However, if a tank or well float switch is used when the tank becomes full or the well 
becomes empty, the Pentair Pentek Solar Drive will stop its operation, and the WARNING 
LED will blink red. 

The WARNING LED will be solid red if the temperature of the Pentair Pentek Solar Drive 
rises above 80°C (176˚), at which point the Pentair Pentek Solar Drive will stop operating and 
wait until the temperature drops. This can happen if the unit is exposed to direct sunlight, 
which should be avoided. 

If the Pentair Pentek Solar Drive gets too hot during normal operation, it will switch to 
Power Deration mode, limiting the maximum power that is transferred to the motor load. 
During that time, the AC LOAD LED will be solid green and the WARNING LED will be solid 
red. If the unit cools down to a regular operating temperature, it will automatically continue 
operation without the thermal deration. If the temperature of the Pentair Pentek Solar 
Drive continues to increase, it will eventually stop operating, at which point the WARNING 
LED will be solid red.

AC LOAD
SOLAR
WARNING

!

S

Figure 13:  

LED 1 –  AC LOAD is ON

AC LOAD
SOLAR
WARNING

S

!

Figure 14:  

LED 2 – SOLAR is BLINKING

Содержание Pentek PSD15

Страница 1: ...pentair com P1061 03 06 19 INSTALLATIONAND OPERATIONMANUAL SOLARDRIVEPSD15 PENTEK...

Страница 2: ...e Installation Requirements 6 Pentair Pentek Solar Drive Hardware 7 Pentair Pentek Solar Drive Overview 8 Pentair Pentek Solar Drive Wiring Instructions 9 Pentair Pentek Solar Drive DIP Switch Setting...

Страница 3: ...tage with a voltage tester NEVER connect power wiring to Drive before mounting the box NEVER handle or service Drive with wet or damp hands Always make sure hands are dry before working on Drive NEVER...

Страница 4: ...ram for a Pentair Pentek Solar Drive operated solar water pumping system is shown in Figure 1 The solar PV array must be connected to an external DC Disconnect and then to the Pentair Pentek Solar Dri...

Страница 5: ...oes not provide branch circuit protection Branch circuit protection must be provided in accordance with the National Electrical Code and any additional local codes ELECTRICAL MECHANICAL Solar PV open...

Страница 6: ...n a shaded location away from any source of heat and in an area free of vegetation Measures must also be made to protect the unit from damage by unauthorized persons large animals overgrowth flooding...

Страница 7: ...Drive controller should be mounted on a wall or other vertical surface using the back bracket see Figure 5 below On the back side of the unit there are two set screws used to hang the unit on the back...

Страница 8: ...e enclosure is open there are three terminal blocks 1 Solar PV wires 2 Motor pump wires 3 Pump or tank sensor wires More information about sensor wiring and DIP switches is provided on page 8 Figure 6...

Страница 9: ...ugh the right gland float switch signal wires feed through the middle gland and motor load wires feed through the left gland When all conductors are wired into the controller the cover door should be...

Страница 10: ...ed on the motor pump and controller combination being used The default value of RMS current when both switches are OFF is 7A for three phase DIP switches 4 and 5 are to be used to match or exceed the...

Страница 11: ...xample of how tank and well switch signals can be used with a digital input port is shown in Figure 10 For a tank application if the active wire is connected to Position 1 and the return wire usually...

Страница 12: ...sition All LEDs will light up and after a few seconds the Pentair Pentek Solar Drive will try to start the pump indicated by a blinking green light and upon starting the green LED will remain ON 4 If...

Страница 13: ...ugh solar production from the solar panels the yellow LED will start blinking again Shutdown To stop the Pentair Pentek Solar Drive s operation the DC Disconnect should be used Once in the OFF positio...

Страница 14: ...PV Panel Manufacturer Model Number _____________________________________________ No of Solar PV Panels in Series ____________________________________________________ Note to Installer Record the data...

Страница 15: ...e is turned OFF as a result of input from one Mode or more external sensors that are connected to the digital input Over Temperature Pentair Pentek Solar Drive stops operation when the temperature Mod...

Страница 16: ...pping charges associated with this warranty and must request warranty service through the installing dealer as soon as a problem is discovered No request for service will be accepted if received after...

Отзывы: