background image

1

7

3

21

11

20

5

9

17

18

22

23

13

4

6

12

10

2

19

14

15

8

18

16

7

6

10

2

9

15

5

8

14

4

11

1

3

10

15

12

13

13

Keystone

 Figure 952 KniFe gate valves

NPS 2 - 24 DiSaSSembly iNStructioNS

© 2012 Pentair inc. all rights reserved.

removal, disassembly and inspection instructions.

Rising spindle valves

• Ensure all parts are clean and free of foreign  

material, particularly the chest area between 
the gland and valve bore.

• For optimum leak-free service, gate faces 

and edges must be smooth, and free of 
galling or burring. Repair or replace if 
excessively worn or damaged.

• Seating faces in valve bore must be smooth 

and undamaged otherwise leakage is likely 
to occur. Replace if necessary.

• Check gland sealing faces on top of 

valve body. they should be smooth and 
undamaged. Repair if necessary.

• Check threads on spindles and bolts - 

repair/ replace if necessary.

• Replace lock nuts if threads are stripped 

or weakened. These are used as protection 
against vibration.

• Check and replace gate guides (13) if necessary.

note:

NPS 2 - 8 F952 valve illustrated

note:

NPS 10 - 24 F952 valve illustrated

www.pentair.com/valves

pplBe-0004-Us 14/07

Removal and disassemBly

1. ensure pipeline is not pressurized and that 

any hazardous medium is drained away.

2. Large valves need a chain block or crane to 

assist. If large, heavy cylinders are fitted, they 
can be removed first if felt necessary:

  • Disconnect actuator air lines and power 

supplies etc.

  • Support actuator, disconnect actuator rod 

from valve gate, undo bridge bolts or hold 
down bolts, remove actuator from valve.

3. Support valve body and remove all flange   

bolts.

4. Remove valve and gaskets from the pipeline.

For nps 2-8 valves

  • Loosen gland box nuts (10) to end of pillar 

(9) threads. Remove clevis fastener (15). 
Remove both bridge nuts (13).

  • Remove handwheel (or actuator assembly. 

Unscrew both pillars (9) and remove.

For nps 10-24 valves

  • Remove gland box nuts (10) and washers 

(11, 12). Remove clevis fasteners (19, 20).

  • Remove upright bolts (14) and washers (15) 

at valve body (1). Remove pillar nut (23) and 
washer (22).

5. Withdraw gland box (3) and gate (2) assembly.
6. Remove gate guides (13) from valve body (1).

Отзывы: