background image

FLECK

 Model ProFloSXT Downflow Service Manual 

• 

27

SERVICE INSTRUCTIONS

Replacing Brine Valve, Injectors and Screen

1.  Turn off water supply to conditioner: 

If the conditioner installation has a “three valve” bypass 

system, first open the valve in the bypass line, then close 

the valves at the conditioner inlet and outlet. 

If the conditioner has an integral bypass valve, put it in the 

Bypass position. 

If there is only a shut-off valve near the conditioner inlet, 

close it.

2.  Relieve water pressure in the conditioner by stepping the 

control into the Backwash position momentarily. Return 

the control to the In Service position.

3.  Unplug electrical cord from outlet.
4.  Disconnect brine tube and drain line connections at the 

injector body.

5.  Remove the two injector body mounting screws. The 

injector and brine module can now be removed from the 

control valve. Remove and discard brine body o-rings.

Brine Valve Replacement

1.  Pull brine valve from injector body. Also remove and 

discard o-ring at bottom of brine valve hole.

2.  Apply silicone lubricant to new o-ring and reinstall at 

bottom of brine valve hole.

3.  Apply silicone lubricant to o-ring on new valve assembly 

and press into brine valve hole. Be sure shoulder on 

bushing is flush with injector body.

Injectors/Screen Replacement

1.  Remove injector cap and screen, discard o-ring. Unscrew 

injector nozzle and throat from injector body.

2.  Screw in new injector throat and nozzle, be sure they are 

sealed tightly. Install a new screen.

3.  Apply silicone lubricant to new o-ring and install around 

oval extension on injector cap.

4.  Apply silicone lubricant to three new o-rings and install 

over three bosses on injector body.

5.  Insert screws thorough injector cap and injector. Place this 

assembly thorough hole in timer housing and into mating 

holes in the valve body. Tighten screws.

6.  Reconnect brine tube and drain line.
7.  Return bypass or inlet valving to normal In Service position. 

Water pressure automatically builds in the conditioner.

NOTE:   

Be sure to shut off any bypass line.

8.  Check for leaks at all seal areas. Check drain seal with the 

control in the Backwash position.

9.  Plug electrical cord into outlet.
10. Set Time Of Day and cycle the control valve manually to 

assure proper function. Make sure control valve is returned 

to the In Service position.

11. Be sure there is enough salt in the brine tank.
12. Start regeneration cycle manually if water is hard.

Timer Replacement

To replace timer refer to Replacing Brine Valve, Injectors and 

Screen, steps 1–3.
1.  Remove the control valve back cover. Disconnect the meter 

cable from the meter assembly.

2.  Remove screw and washer at drive yoke. Remove timer 

mounting screws. The entire timer assembly then lifts  

off easily.

3.  Put new timer on top of valve. Be sure drive pin on main 

gear engages slot in drive yoke.

4.  Replace timer mounting screws. Replace screw and 

washer at drive yoke. Replace meter signal wire.

5.  Return bypass or inlet valving to normal In Service position. 

Water pressure automatically builds in the conditioner.

NOTE:   

Be sure to shut off any bypass line.

6.  Replace the control valve back cover.
7.  Follow Injectors/Screen Replacement, steps 9–12.

Piston Assembly Replacement

To replace piston assembly refer to Replacing Brine Valve, 

Injectors and Screen, steps 1–3.
1.  Remove the control valve back cover. Disconnect the meter 

cable from the meter assembly.

2.  Remove screw and washer at drive yoke. Remove timer 

mounting screws. The entire timer assembly will now lift 

off easily. Remove end plug retainer plate.

3.  Pull upward on end of piston yoke until assembly is out  

of valve.

4.  Inspect the inside of the valve to make sure that all spacers 

and seals are in place, and that there is no foreign matter 

that would interfere with the valve operation.

5.  Take new piston assembly as furnished and push piston 

into valve by means of the end plug. Twist yoke carefully 

in a clockwise direction to properly align it with drive gear. 

Replace end plug retainer plate.

6.  Place timer on top of valve. Be sure drive pin on main gear 

engages slot in drive yoke.

7.  Replace timer mounting screws. Replace screw and 

washer at drive yoke.

8.  Return bypass or inlet valving to normal In Service position. 

Water pressure automatically builds in the conditioner.

NOTE:   

Be sure to shut off any bypass line.

9.  Replace the control valve back cover.
10. Follow Injectors/Screen Replacement, steps 9–12.

Содержание FLECK PROFLOSXT DOWNFLOW

Страница 1: ...www pentairaqua com FLECK MODEL PROFLOSXT DOWNFLOW SERVICE MANUAL...

Страница 2: ...mbing professional This unit is designed to be installed on potable water systems only This product must be installed in compliance with all state and municipal plumbing and electrical codes Permits m...

Страница 3: ...low A Downflow B Upflow C Upflow Variable 3 Meter Size A 3 4 inch Elec Paddlewheel B 3 4 inch Elec Turbine 4 System Type A System 4 1 Tank 1 Meter Immediate or Delayed Regeneration B System 4 Time Clo...

Страница 4: ...for cutting height of the distributor tube If there is no dimensional drawing cut the distributor tube flush with the top of the tank 5 Lubricate the distributor o ring seal and tank o ring seal Plac...

Страница 5: ...Indicator Service Icon Programming Icon Extra Cycle Button Up Button Down Button Error Information Icon Features of the SXT Power backup that continues to keep time and the passage of days for a minim...

Страница 6: ...the Extra Cycle button during a regeneration cycle immediately advances the valve to the next cycle step position and resumes normal step timing Control Operation During Programming The control only...

Страница 7: ...ty Factor Percentage of the system capacity to be used as a reserve RC Fixed Reserve Capacity Fixed volume to be used as a reserve DO Day Override The system s day override setting RT Regen Time The t...

Страница 8: ...entering Master Programming Mode The Display Format setting specifies the unit of measure that will be used for volume and how the control will display the Time of Day This option setting is identifi...

Страница 9: ...ING MODE CONTINUED 9 Safety Factor Display Code SF Press the Extra Cycle button Use this display to set the Safety Factor This setting specifies what percentage of the system capacity will be held as...

Страница 10: ...on for each day Use the Up and Down buttons to adjust the setting as needed Press the Extra Cycle button to accept the setting and move to the next day Note that the control requires at least one day...

Страница 11: ...s while in service and the time of day is NOT set to 12 01 PM 2 Use this display to adjust the Day Override This option setting is identified by DO in the upper left hand corner of the screen 3 Press...

Страница 12: ...in service 2 Press the Up button Use this display to view the current Flow Rate This option setting is identified by FR in the upper left hand corner of the screen 3 Press the Up button Use this displ...

Страница 13: ...42637 LABEL DISPLAY SXT 8 1 18260 COVER FRONT 9 1 19927 CAM D F SXT 10 1 18211 01 GEAR MAIN DOWNFLOW MACHD 11 1 18228 CAM BRINE VALVE 12 1 18202 BACK PLATE 13 1 40251 MOTOR 24v 50 60hz 14 2 13602 SCRE...

Страница 14: ...14 FLECK Model ProFloSXT Downflow Service Manual CONTROL VALVE ASSEMBLY...

Страница 15: ...lug Injector 27 2 13771 O ring 012 28 1 18275 X Throat Injector specify size 000 00 0 1 2 3 29 1 18274 X Nozzle Injector specify size 000 00 0 1 2 3 30 1 18273 Vortex Generator 31 1 18271 Screen Injec...

Страница 16: ...2 19569 Clip Flow Meter 3 1 19797 Meter Body Assembly 3 4 inch Turbine 4 4 13305 O ring 119 5 1 19791 01 Harness Assembly Flow Meter 1 19791 02 Meter Cable Assy 35 inch 6 19797 Meter 3 4 Turbine No C...

Страница 17: ...4 inch NPT Plastic 4B 1 13708 40 Yoke 1 inch Sweat 13708 45 Yoke 3 4 inch Sweat 19275 Yoke Angle 90 Deg 3 4 inch NPT 19275 45 Yoke Angle 90 Deg 3 4 inch Sweat 19620 01 Yoke Assy 3 4 inch R Angle 90 De...

Страница 18: ...11978 Plate Bypass Top 5 1 13604 01 Label Bypass Standard Mount 6 8 15727 Screw Hex Wsh Hd 10 24 x 1 2 7 1 11986 Plate Bypass Bottom For Service Assembly Numbers See the Back of this Manual 8 1 11979...

Страница 19: ...0 Fitting Sleeve 3 8 Celcon 7 1 10329 Fitting Tube 3 8 Nut Brass 8 1 10186 Nut Hex 10 32 9 1 60002 34 Air Check 500 34 inch Long 60003 34 Air Check 500 HW 34 inch Tube 10 1 10149 Rod Float 11 1 10700...

Страница 20: ...24 Nylon Black 5 1 19652 01 Poppet Assy SBV w O ring 6 1 19649 Flow Dispenser 7 1 11183 O ring 017 8 1 19647 Elbow Safety Brine Valve For Service Assembly Numbers See the Back of this Manual 9 2 19625...

Страница 21: ...e A Air in water system A Assure that well system has proper air eliminator control Check for dry well condition B Improperly sized drain line flow control B Check for proper drain rate 6 Iron in cond...

Страница 22: ...e been more than 99 days since the last Regeneration If the Day of the Week mode of regeneration is selected and days since last regeneration exceeds 7 days Regeneration must occur for the unit to rec...

Страница 23: ...FLECK Model ProFloSXT Downflow Service Manual 23 WATER CONDITIONER FLOW DIAGRAMS Service Position Backwash Position Brine Slow Rinse Position Rapid Rinse Position Brine Tank Fill Position...

Страница 24: ...24 FLECK Model ProFloSXT Downflow Service Manual FLOW DATA INJECTOR DRAW SLOW RINSE RATES...

Страница 25: ...FLECK Model ProFloSXT Downflow Service Manual 25 DIMENSIONAL DRAWING...

Страница 26: ...LACK ORANGE WT BLK BLACK WHITE GREEN BLUE BLUE WHITE BLUE WHITE BLUE PURPLE ORANGE BLACK WT BLK YELLOW BLACK BROWN METER P1 S N N H S VDO P2 N O H PWR H S CB1 50 60 HZ CB1 SXT Timer T1 24V Transformer...

Страница 27: ...e control in the Backwash position 9 Plug electrical cord into outlet 10 Set Time Of Day and cycle the control valve manually to assure proper function Make sure control valve is returned to the In Se...

Страница 28: ...y builds in the conditioner NOTE Be sure to shut off any bypass line 8 Replace the control valve back cover 9 Follow Injectors Screen Replacement steps 9 12 Meter Replacement To replace meter refer to...

Страница 29: ...INCHTUBE 60795 02 DISTRIBUTOR ASSY 1 INCH NARROW RED 008 W 72 INCH TUBE DRAIN LINE FLOW CONTROLS 60705 XX DRAIN LINE FLOW CONTROL FROM 6 7 0 GPM 60706 XX DRAIN LINE FLOW CONTROL W QUICK CONNECT FROM...

Страница 30: ...10 1 INCH BSP 13398NP 1 INCH NPT NICKEL PLATED 13398 10NP 1 INCH BSP NICKEL PLATED 18706 1 INCH PLASTIC MNPT 18706 10 1 INCH PLASTIC MBSP 18706 02 3 4 INCH PLASTIC MNPT 18706 12 3 4 INCH PLASTIC MBSP...

Страница 31: ...FLECK Model ProFloSXT Downflow Service Manual 31...

Страница 32: ...emarks and logos are the property of their respective owners Because we are continuously improving our products and services Pentair reserves the right to change specifications without prior notice Pe...

Отзывы: