background image

Installer manual Fleck 4600 MECH - Installation

42 / 92

Ref. MKT-IM-027 / C - 12.11.2019

Caution - material

Risk of damage due to over-force !

The drain line plastic elbow must always be hand-tighten without using the elbow as a
lever.

The drain plastic elbow is not designed to support the weight of the tube. The tube has to
have its own support.

Do not over tighten the hose tightening ring on its plastic support.

Preferably, the unit should not be more than 6.1 m from the drain. Use an appropriate adapter
fitting to connect plastic tubing to the drain line connection of the valve.

If the backwash flow rate exceeds 22.8 lpm or if the unit is located 6.1-12.2 m from the drain, use
19.0 mm (¾") tubing. Use appropriate fittings to connect the 19.0 mm (¾") tubing to the
12.7 mm (½") drain connection on the valve.

The drain line may be elevated up to 1.8 m providing the run does not exceed 4.6 m and water
pressure at the softener is not less than 2.76 bar. Elevation can increase by 61 cm for each
additional 0.69 bar of water pressure at the drain connector.

Where the drain line is elevated but empties into a drain below the level of the valve, form a 18 cm
loop at the far end of the line so that the bottom of the loop is level with the drain line connection.
This will provide an adequate siphon trap.

Where the drain empties into an overhead sewer line, a sink-type trap must be used.

Secure the end of the drain line to prevent it from moving.

Mandatory

Waste connections or the drain outlet shall be designed and constructed to provide
connection to the sanitary waste system through an air-gap of 2 pipe diameters or
38.1 mm (1½"), whichever is larger.

Caution - material

Risk of damage due to lack of gap !

Never insert the drain line directly into a drain, sewer line or trap. Always allow an air
gap between the drain line and the waste water to prevent the possibility of sewage being
back-siphoned into the softener.

Содержание Fleck 4600 MECH

Страница 1: ...FLECK 4600 MECH INSTALLER MANUAL WATER PURIFICATION...

Страница 2: ...inition 11 2 2 Serial label location 12 2 3 Hazards 12 2 3 1 Personnel 12 2 3 2 Material 13 2 4 Hygiene and sanitization 13 2 4 1 Sanitary issues 13 2 4 2 Hygiene measures 13 3 Description 14 3 1 Tech...

Страница 3: ...r 34 5 3 3 Electrical 34 5 3 4 Mechanical 35 5 4 Integration constraints 35 5 5 Valve connection to piping 36 5 5 1 Top mounted valve installation 36 5 6 Block diagram and configuration example 38 5 7...

Страница 4: ...3 Regeneration test 58 9 2 Recommended maintenance plan 59 9 2 1 Valve used for softening 59 9 2 2 Valve used for softening 61 9 3 Recommendations 63 9 3 1 Use original spare parts 63 9 3 2 Use origi...

Страница 5: ...e valves parts list 82 11 5 Bypass valve assembly list 83 11 5 1 1 BSP female stainless steel bypass 83 11 5 2 1 BSP female stainless steel bypass with mixing 85 11 5 3 Plastic bypass no yoke 86 11 6...

Страница 6: ...llowed This manual is a reference and will not include every system installation situation The person installing this equipment should have training in the Fleck series MECH controllers and water soft...

Страница 7: ...low DLFC Drain Line Flow Controller FR Fast Regeneration HW Hot Water Imm Immediate Inj Injector N A Not Available PN Part Number Regen Regeneration S S Seals Spacers SBV Safety Brine Valve STD Standa...

Страница 8: ...at this list is not an exhaustive list of all our certifications In case of need for more information please contact us 1 7 Procedure for technical support Procedure to follow for any technical suppor...

Страница 9: ...assembly of systems or products with this product and vice versa use of a non compatible lubricant grease or chemicals of any type and not listed by the manufacturer as compatible for the product fail...

Страница 10: ...nstantaneously access to all updated information related to the product such as valve s and tanks detailed configuration manuals spare parts lists troubleshooting recommendations multi lingual videos...

Страница 11: ...ord indicates a potentially hazardous situation that can result in serious or fatal injury if not avoided CAUTION This combination of symbol and keyword indicates a potentially hazardous situation tha...

Страница 12: ...any other legal regulations accident prevention and environmental protection measures as well as any recognized technical regulations relating to appropriate and risk free methods of working which ap...

Страница 13: ...manual regenerations in order to clean the media bed During such operations do not use the water for human consumption Perform a disinfection of the system in the case of installations for treatment o...

Страница 14: ...ient temperature 5 40 C Flow rates 3 5 bar inlet valve only Continuous service flow p 1 bar 4 5 m3 h Peak service flow p 1 7 bar 5 9 m3 h Cv 5 2 gpm Kv 4 5 m3 h Maximum backwash flow p 1 8 bar 1 6 m3...

Страница 15: ...ltages Within the limits of category II Pollution Degree 3 Temporary overvoltages must be limited in duration and in frequency Environmental conditions Indoor use only temperature from 5 C to 40 C max...

Страница 16: ...alve itself at different flow rates It allows predetermining the maximum flow rate going through the valve depending on the system settings inlet pressure etc It also allows to determine the valve pre...

Страница 17: ...Installer manual Fleck 4600 MECH Description Ref MKT IM 027 C 12 11 2019 17 92 3 3 Outline drawing...

Страница 18: ...MKT IM 027 C 12 11 2019 3 4 Components description and location Green light Program wheel 24 hours wheel Red light Meter Not included in case of time clock Drain line Imlet Brine cam Brine valve Brine...

Страница 19: ...hen directed down through the resin bed and up through the riser tube to the drain The hardness ions on the resin beads are replaced by sodium ions and are sent to the drain The resin is regenerated d...

Страница 20: ...Outlet Drain SERVICE NORMAL USE C1 BACKWASH Outlet Inlet Inlet Outlet Drain Drain C2 BRINE DRAW SLOW RINSE C3 SECOND BACKWASH Double backwash unit only From brine tank Outlet Inlet Inlet Outlet C4 RA...

Страница 21: ...the media Backwash cycle C1 The flow of water is reversed by the valve and directed down through the riser tube and up through the filter media During the backwash cycle the filter bed is expanded an...

Страница 22: ...600 MECH Description 22 92 Ref MKT IM 027 C 12 11 2019 Outlet Inlet Inlet Outlet Drain SERVICE NORMAL USE C1 BACKWASH Outlet Inlet Inlet Outlet Drain C2 RAPID RINSE SERVICE NORMAL USE Untreated water...

Страница 23: ...clock softeners To configure the valve as volumetric or time clock softener the 24 hour gear the skipper or program wheel and the meter must be set as shown below 3 6 1 Volumetric Program wheel assy 8...

Страница 24: ...Installer manual Fleck 4600 MECH Description 24 92 Ref MKT IM 027 C 12 11 2019 3 6 2 Time clock Skipper wheel assy 7 days PN 14860 Skipper wheel assy 12 days PN 24100 24 hour gear PN 13009 21SP...

Страница 25: ...he mixing can be set from 0 to 50 of hard water i e 0 turn 0 of hard water with 100 of treated water and 1 turn 50 of hard water with 50 of treated water 0 turn 1 turn turn 1 turn turn 1 turn turn Fas...

Страница 26: ...r specification To ensure that no additional pretreatment prior to softening is required The below sizing method can be applied for both residential and industrial softeners The sizing of a softener m...

Страница 27: ...l be sufficient so that even when the peak flow rate is reached the velocity is still between the above values depending on the hardness When sizing a softener always choose the resin volume and tank...

Страница 28: ...between 2 regenerations This last capacity takes into account the hardness of the water to be treated and is expressed in m3 or litre the combined capacity which represents the volume of water that c...

Страница 29: ...dH Mandatory If a mixing device is set on the valve before meter use TH THINLET THOUTLET Having determined the previous capacity allows the operator to know the service cycle duration 4 2 4 Valve conf...

Страница 30: ...al flow rate passing through the injector L h BV bed volume of resin L Info This value does not correspond to the brine draw flow rate but to the total flow rate passing through the injector Refer to...

Страница 31: ...MKT IM 027 C 12 11 2019 31 92 4 4 1 1600 injectors INJECTOR 0 Total Rinse Draw Flow rate l min Inlet pressure bar Rinse Draw INJECTOR 1 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 2 T...

Страница 32: ...g 32 92 Ref MKT IM 027 C 12 11 2019 4 4 2 1650 injectors INJECTOR 0 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 1 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 2 Total...

Страница 33: ...he device please ensure to have disconnected the transformer from the power source to shut off inlet water supply to the valve and to drain water pressure opening a tap down line of the valve 1 Be car...

Страница 34: ...me clock hot water version a minimum of 1 4 bar dynamic pressure on injector of water pressure is required for the regeneration valve to operate effectively Mandatory Do not exceed a maximum of 8 6 ba...

Страница 35: ...mm in diameter Use 19 mm pipe if the backwash flow rate is greater than 26 5 lpm or the pipe length is greater than 6 m do not support the weight of the system on the valve fittings plumbing or the b...

Страница 36: ...all so that the weight of it is not applying any stress on the valve and tank Support to the wall min 200 mm flexible The diagrams above illustrate how the flexible piping connection should be mounted...

Страница 37: ...may void the warranty of Pentair products in the same way using lubricant Page 37 on the valve thread is not allowed and will void the warranty for the valve and tank Indeed using lubricant there wil...

Страница 38: ...tegrated in the valve Pressure gauge Valve Resin tank Filter cartridge BU28518 XX 21675 Main inlet Pressure regulator Suggested options Check valve to prevent water harm By pass Meter Mixing device Dr...

Страница 39: ...sage and regenerates the system as soon as the system capacity is reached delayed control The controller measures water usage and regenerates the system at the specified regeneration time 02h00 after...

Страница 40: ...600 MECH Installation 40 92 Ref MKT IM 027 C 12 11 2019 5 8 Electrical connections Green lamp Service Red lamp Regeneration 220 V 50 Hz 220 V 50 Hz N O N C Cam Valve motor Valve motor Microswitch C Wi...

Страница 41: ...to bad mounting Do not solder pipes with lead based solder Do not use tools to tighten plastic fittings Over time stress may break the connections Do not use petroleum grease on gaskets when connectin...

Страница 42: ...un does not exceed 4 6 m and water pressure at the softener is not less than 2 76 bar Elevation can increase by 61 cm for each additional 0 69 bar of water pressure at the drain connector Where the dr...

Страница 43: ...n the side of the tank Insert the overflow fitting into the tank and tighten with plastic thumb nut and gasket as shown below Attach a 12 7 mm I D tubing not supplied to fitting and run to drain Do no...

Страница 44: ...hoses may shrink because of the vacuum during brine draw The brine line from the tank connects to the valve Make the connections and hand tighten Be sure that the brine line is secure and free from ai...

Страница 45: ...Installer manual Fleck 4600 MECH Programming Ref MKT IM 027 C 12 11 2019 45 92 6 Programming 6 1 Time of day 1 Press the clutch 1 2 Turn the hour wheel 2 to display the correct hour in the window 3...

Страница 46: ...l 2 Available capacity Shows the system remaining capacity 3 Program wheel Defines the system capacity in m3 4 Time of day Shows the current time 5 Service position Service Regeneration Backwash Brine...

Страница 47: ...water between two regenerations using the following formula Water capacity m3 Exchange capacity m3 tH Reserve capacity m3 Water hardness tH 6 2 2 Set the system capacity 1 Lift the transparent disc 1...

Страница 48: ...ock 1 24 hours wheel 2 Program wheel Defines the number of days between two regenerations 3 Time of day Shows the current time 4 Service position Service Regeneration Backwash Brine draw slow rinse Br...

Страница 49: ...serve capacity m3 Water hardness tH Number of days between regenerations Water capacity m3 Daily water consumption m3 6 3 2 Set the number of days between two regenerations 1 Push the pins 1 out to se...

Страница 50: ...ume definition Set the weight of salt to be used during regeneration using the following table and formula Salt weight g Lresin Exchange capacity tH m3 Lresin Salt weight g tH m3 80 4 20 125 5 25 180...

Страница 51: ...eration 1 Calculate the weight of salt needed per regeneration see Salt volume definition Page 50 2 Remove the screws 2 and the cover 1 3 Loosen 5 4 Adjust the segment of the brine cam 4 on the sticke...

Страница 52: ...position 8 Fill approximately 25mm of water above the grid plate if used Otherwise fill to the top of the air check in the brine tank Do not add salt to the brine tank at this time 9 Initiate a manua...

Страница 53: ...esins synthetic gel zeolite greensand and bentonites 5 25 Sodium hypochlorite If stronger solutions are used such as those sold for commercial laundries adjust the dosage accordingly Dosage Polystyren...

Страница 54: ...Fleck 4600 MECH Commissioning 54 92 Ref MKT IM 027 C 12 11 2019 7 2 3 Electro chlorination Valves or systems already equipped with an electrochlorinator device or system will be sanitized during the...

Страница 55: ...Ref MKT IM 027 C 12 11 2019 55 92 8 Operation 8 1 Display during operation 8 1 1 During service Valve in service 8 1 2 During regeneration During regeneration the display shows the current cycle step...

Страница 56: ...s which may reduce the lifetime of the ion exchange resins Refer to the technical guides for resins in common use providing necessary checks on the system 8 3 Manual regeneration Mandatory The control...

Страница 57: ...tion of softener filter and associated ancillaries and check for any leaks ensure valve connection to piping is made with adequate flexibility as per manufacturer instruction 2 Inspection of electrica...

Страница 58: ...i e outlet shut off during regeneration and or brine line shut off valve s 4 Test and record Total Hardness of outlet water from softener vessel s 9 1 3 2 Valve used for filtration 1 Initiate manual...

Страница 59: ...sary Check clean replace if necessary Replace O rings Check for watertightness clean or replace in case of leakage Check for watertightness clean or replace in case of leakage Check for watertightness...

Страница 60: ...Check Check Check Valve to piping watertightness Check Check Check Check Check Wear parts durability strongly affected by raw water quality and regeneration frequency Electronic parts durability stro...

Страница 61: ...ace O rings Check for watertightness clean or replace in case of leakage Check for watertightness clean or replace in case of leakage Check for watertightness clean or replace in case of leakage Check...

Страница 62: ...to piping watertightness Check Check Check Check Check Wear parts durability strongly affected by raw water quality and regeneration frequency Electronic parts durability strongly affected by power so...

Страница 63: ...motors Refer to maintenance sheet 9 3 2 Use original approved lubricants Dow Corning 7 Release Agent 9 3 3 Maintenance instructions Disinfect and clean the system at least once a year or if the treat...

Страница 64: ...27 C 12 11 2019 9 4 2 Controller motor replacement 1 Using a flat screwdriver unscrew 4 and remove the cover 3 2 Disconnect the motor 1 3 Using a Philips screwdriver unscrew 2 and remove the motor 1 4...

Страница 65: ...ect the meter cable 1 if available 2 Using a flat screwdriver unscrew 5 and remove the cover 4 3 Using a flat screwdriver unscrew 3 and remove the washer 2 4 Using a flat screwdriver or an 8 mm wrench...

Страница 66: ...er 1 remove a spacer 8 6 Repeat the two previous steps for all the seals and spacers 7 Lubricate each new seals 7 8 Put back a seal 7 using the stuffer 2 9 Put back a spacer 8 using the stuffer 2 10 R...

Страница 67: ...Installer manual Fleck 4600 MECH Maintenance Ref MKT IM 027 C 12 11 2019 67 92 Item Part number Description Packaging quantity 1 13061 Puller 1 2 12763 Stuffer 1...

Страница 68: ...T IM 027 C 12 11 2019 9 4 5 Micro switches replacement 1 Using a flat screwdriver unscrew 2 and remove the cover 1 2 Using a Phillips screwdriver unscrew 5 and extract the protection plate 4 and the m...

Страница 69: ...12 11 2019 69 92 9 4 6 Brine cam replacement 1 Remove the power head see Power head disassembly replacement Page 65 2 Using a flat screwdriver unscrew 1 3 Remove the washer 2 and the brine cam 3 4 Cha...

Страница 70: ...move the injector nozzle 3 6 Using a flat screwdriver remove the injector throat 1 7 Clean or change the injector throat 1 the injector nozzle 3 the filter 2 and the seal 4 8 Lubricate all seals with...

Страница 71: ...he BLFC 3 from the grid 4 4 Clean with a terry cloth or change the BLFC 3 and the seal 2 5 Clean the grid 4 6 Lubricate the seal 2 with approved lubricant only Caution material Risk of damage due to w...

Страница 72: ...cross threaded 3 Rotate the valve 1 clockwise and freely without using force until it comes to a stop Info This stop position is considered point zero 4 Rotate the valve 1 clockwise from point zero t...

Страница 73: ...lean or replace injector and or filter Insufficient water flowing into brine tank Check brine tank filling time and clean flow regulator Hot water tank hardness Repeated flushing of the hot water tank...

Страница 74: ...he brine tank Plugged drain line flow control Clean drain line flow control Plugged injector system Clean injector and screen change if necessary Faulty brine valve Change brine valve Bad programming...

Страница 75: ...correctly Power head not operating properly Change power head Controller cycles continuously Power head not operating properly Change power head Faulty microswitch or wiring loom Change microswitch or...

Страница 76: ...CH Spare parts and options 76 92 Ref MKT IM 027 C 12 11 2019 11 Spare parts and options 11 1 Valve parts list Item Part number Description Packaging quantity 1 BU28518 01 VB assy 4600 filter 1 BU28518...

Страница 77: ...2473SP Screw hex washer 10 24 x 5 8 18 8SS 50 3 11737SP Screw TH M5x12 50 4 BU13546 Top plate 1 5 18928 US Piston assy 4600 5600 filter 1 24116 US Piston assy 4600 5600 1 24117 US Piston assy 4600 560...

Страница 78: ...00 DF 1 24121 0 25 Brine cam assy 4600 5600 DF 1 24121 0 50 Brine cam assy 4600 5600 DF 1 24121 1 Brine cam assy 4600 5600 DF 1 25736 0 12 Brine cam assy 4600 5600 DF FR 1 25736 0 25 Brine cam assy 46...

Страница 79: ...gear 10 15 13312SP Spring idler 50 16 13018SP Idler pinion 50 17 13170SP Main drive gear shaft 10 18 13300SP Ball dia 50 19 14457SP Spring detent 50 20 18158SP Screw 50 21 14087SP Insulator 50 22 102...

Страница 80: ...quantity 1 13011 ARM cycle actuator 1 2 13296SP Screw 50 3 13014 Pointer regen 1 4 24100 Skipper wheel assy 12 days 1 14860 Skipper wheel assy 7 days 1 5 BU26968 Front label TC picto with lights 10 2...

Страница 81: ...e 10 Not shown BU28233 Brine cam salt label 3 14 kg black 10 Not shown BU28234 Brine cam salt label 6 28 kg red 10 Not shown 13300SP Ball dia 50 Not shown 13311SP Spring detent 50 Not shown 13864SP Sk...

Страница 82: ...625SP Brine Valve 1650 plastic nut assy 10 5 19649 Flow disperser 1 6 PWG19652 01 Poppet assy SBV with o ring 1 7 18312SP Retainer drain 10 8 PWG19803 Safety brine valve arm assy 1 9 19645 Body safety...

Страница 83: ...Installer manual Fleck 4600 MECH Spare parts and options Ref MKT IM 027 C 12 11 2019 83 92 11 5 Bypass valve assembly list 11 5 1 1 BSP female stainless steel bypass...

Страница 84: ...10 3 24419 10SP Bypass handle red 10 4 15727 Screw Hex washer head 10 24 x 0 5 8 5 13604 01 Label bypass standard 1 6 BU11978 Cover bypass Top 1 7 BU11972 Plug bypass 1 8 14105SP Seal bypass 560CD 5...

Страница 85: ...xing Item Part number Description Packaging quantity 1 24734 10 Bypass 1 BSP female brass with mixing 1 2 BU28642 Screw TC slotted M6x30 10 3 24419 10SP Bypass handle red 10 4 11737SP Screw TH M5x12 8...

Страница 86: ...tom 1 11 5 3 Plastic bypass no yoke Item Part number Description Packaging quantity 1 BU26054 Bypass plastic 1 2 13314SP Screw slot ind hex 8 18 x 0 60 50 3 13255SP Clip mounting 12 4 13305 01SP O rin...

Страница 87: ...tributor assy 1 high flow HW 1m10 24 21675 Distributor assy 1 high flow HW 1m88 12 2 BU28509 Distributor assy 1 UF high capacity HW 1 m 10 24 25639 Distributor assy 1 high capacity HW 1m88 24 3 BU2850...

Страница 88: ...are parts and options 88 92 Ref MKT IM 027 C 12 11 2019 Item Brine system Part number Description Packaging quantity 1600 18168 Air checks 500A 915mm 36 48 26773 Air checks 500A 1m25 48 23473 Air chec...

Страница 89: ...meter except 2 3 10 5 24102 Meter body assy ring 1 6 25871 Meter assy extended plastic 90 1 7 BR15659 Meter cover assy plastic extended 90 1 8 26156 10 Eco bypass assy 40 m red handle HW 1 9 15218 Co...

Страница 90: ...country of installation The components included in the system must be separated and recycled in a waste recycling center that conforms with the legislation in force in the country of installation Thi...

Страница 91: ...Installer manual Fleck 4600 MECH Notes Ref MKT IM 027 C 12 11 2019 91 92...

Страница 92: ...www pentairaquaeurope com...

Отзывы: