Pentair CD-15G Скачать руководство пользователя страница 3

1

INTELLIZONE™ COMMERCIAL OZONE GENERATOR Installation and User's Guide

SECTION 1 General Information

Description 

The IntelliZone

 Commercial Ozone Gererator (Models 

CD-15G and CD-25G (521659, 521660, 521761 and 
521762) described in this manual is designed to provide 
the benefits of ozonated water in an environmentally 
safe and effective manner. The high quality, specially 
engineered components ensure efficient ozone output 
and reliable performance.

Thos ozone generator is safe and harmless  

 

to your equipment if installed properly.

Specifications

 

For detailed specifications refer to the ozone  

 

 

generator specification label located on the inside    

 

of the door on the unit.

 

Location Requirements*: 

 

Mounting:  Floor or wall mount in a clean, protected 

 

    

area using supplied brackets.

 

Ventilation:   Room should provide 6 air changes    

 

 

per hour

 

Ambient Temp.:  40–100˚F (5–38˚C)

 

* Protection from weather elements must be provided   

 

  for outdoor installations. Operating outside of the    

 

  recommended temp. ranges may result in damage   

 

  not covered under the manufacturer’s warranty.

SECTION 2 Installation

Location

The ozone generator is designed for either floor or wall 
mounting in a clean, protected area, either indoors or 
outdoors. Locate generator out of reach of sprinklers or 
drainage spouts. Allow sufficient access for maintenance 
and all tubing and electrical wires. The generator must 
not be placed in locations where ambient ozone levels 
exceed 0.01 PPM.

Mounting

 

NOTE: Do not remove compressor packing  

 

 

material until unit has been mounted.

 

Wall Mount Option

 

1.   Attach two mounting brackets to wall using  

 

 

  anchors appropriate for mounting surface.  

 

 

See Figure 2.

 

 

2.  Using 1/4"-20 bolts (with washers as shown)  

 

 

  secure generator to mounts.

 

Floor Mount Option

 

1.  Use the four 1/4"-20 bolts with washers to  

 

 

  secure feet to bottom of cabinet.

 

2.  Stand upright and securely fasten to concrete    

 

  slab using appropriate anchors and bolts.

Figure 2: Wall Mount

Figure 1

A

A

621

R24.5

DOOR SWING

(IF WALL MOUNTED) 4.0 102

MIN. CLEARANCE 

102

4.0

24.4 620

39.2 995

MOUNTING

BRACKETS (2)

DIM "A" = 6 [152] MIN CLEARANCE

311

12.3

24.1 613

11.7 297

Содержание CD-15G

Страница 1: ...E GENERATOR Models CD 15G CD 25G All Models INSTALLATION AND USER S GUIDE IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS INTELLIZONE TM COMMERCIALOZONESYSTEM AD...

Страница 2: ...lation instructions Do not install within an enclosure that would restict ventilation Applicable to cord plug connected units only Risk of electric shock Connect only to a properly grounded grounding...

Страница 3: ...g outside of the recommended temp ranges may result in damage not covered under the manufacturer s warranty SECTION 2 Installation Location The ozone generator is designed for either floor or wall mou...

Страница 4: ...ed by the venturi injector allows the generator to operate safely under vacuum See installation manual for Model 521683 or 521684 for proper venturi installation Ozone Gas Line 1 Connect ozone tubing...

Страница 5: ...al ORP levels will vary per application However the system will not start under any of the following conditions 1 The system will not start up if the door is not secured A door interlock switch is inc...

Страница 6: ...c sensing element used is polarographic membraned sensor which measures ozone directly External Devices that Control System Power The devices turn power to the ozone generator on or off Examples of su...

Страница 7: ...tails for External Control Devices ALL MODELS EXCEPT 521761 and 521762 Remove jumper if ORP controller or dissolved ozone monitor is used Connect dry contact leads from controller monitor or leave ope...

Страница 8: ...mper and connect dry contact leads if external device is used ambient ozone flow switch etc Relay Panel RECEPTACLE IEC 60320 C 14 CONNECTOR INTERFACE 5 PIN EXTERNAL CIRCUIT BREAKERS 2 COOLING WATER IN...

Страница 9: ...Figure 7 Remove filter cover plate to access filter Rinse filter in warm soapy water and blow dry Replace filter For models 521761 and 521762 remove and clean intake screens 3 Perform general cleanin...

Страница 10: ...ch 23 Power switch 2 12VDC power supply optional 13 Flowmeter 24 Pressure relief valve 3 Backflow prevention device BFPD h c t i w s e r u s s e r P 5 2 e s u F 4 1 e m r u o H 5 1 e c i f i r o s s a...

Страница 11: ...in BFPD vessel and replace SS check valve a Unit flowmeter valve is closed Adjust flowmeter valve open b Unit jumper s at TB1 are removed optional system control hookup e g flow switch and or ambient...

Страница 12: ...10 INTELLIZONE COMMERCIAL OZONE GENERATOR Installation and User s Guide TSG CD 15G 25G 3 of 4 4 1529 01_Rev A...

Страница 13: ...11 INTELLIZONE COMMERCIAL OZONE GENERATOR Installation and User s Guide TSG CD 15G 25G 4 of 4 4 1529 01_Rev A...

Страница 14: ...then upon the Customer following the procedures set forth below Pentair will at its option repair or replace such item or part at its own cost and expense Pentair s maximum obligation under this warr...

Страница 15: ...ppm 5 min momentary value 8 per shift Other Designations Triatomic oxygen CAS No 10028 15 6 NIOSH RTECS No RS8225000 SECTION III PHYSICAL DATA Boiling Point Vapor Pressure Vapor Density AIR 1 Solubil...

Страница 16: ...ush eyes continuously with flooding amounts of water for 15 minutes or until transported to a medical facility Inhalation Remove exposed person to fresh air support breathing administer humidified oxy...

Страница 17: ...WATER D O T Shipping Classification NON REGULATED I PHYSICAL DATA Boiling Point 212 F Freezing Point 32 F Specific Gravity 1 0 Solubility in Water COMPLETE Evaporation Rate APPROX 1 Physical Form LIQU...

Страница 18: ...be avoided to prevent irritation and drying of the skin V EMERGENCY AND FIRST AID PROCEDURES Eye Contact If exposure to water containing aqueous solution of ozone causes irritation to eyes flush eyes...

Страница 19: ...e well below the periodic exposure levels established by OSHA for worker safety through the use of DEL s ozone management technology Precautions To Be Taken In Handling Aqueous solutions of ozone in p...

Страница 20: ...18 INTELLIZONE COMMERCIAL OZONE GENERATOR Installation and User s Guide Notes...

Страница 21: ...19 INTELLIZONE COMMERCIAL OZONE GENERATOR Installation and User s Guide Notes...

Страница 22: ...or its affiliated companies in the United States and or other countries Unless expressly noted names and brands of third parties that may be used in this document are not used to indicate an affiliati...

Отзывы: