background image

 
To connect the machine to the mains, perform the operations 
described here below: 
- Make sure that the motor is suitable to the mains voltage and 

frequency 

- Cut the electric system off by using a cut-off switch 
- Loosen the screws that fix the cover to the terminal block 
- Insert the supply cable into the cable holder. 
- Connect the phases and the ground to the terminals following 

the instructions shown on the diagram inside the terminal 
block. 

- Reposition the cover of the terminal block with the related 

gasket 

- Tighten the screws that fix the cover to the terminal block 
- Insert the electric supply by using the cut-off switch 
- Supply one current impulse to the machine  
- Check the direction of rotation of the motor 
 

A- If the direction of rotation complies with the direction of the 

rotation indicated by the arrows shown on the machine 
head, the connections are correct 

 
B- If the direction of rotation is opposed to the one shown by 

the arrows present on the machine head, perform the 
following operations: 
-- Cut the electric system off by using the cut-off switch 
-- Loosen the screws that fix the terminal block cover in 

position 

-- Invert the connection of the two phases 
-- Reposition the terminal block cover with the related 

gasket 

-- Tighten the screws of the terminal block cover 
 

4. OPERATION 

 

Warning 

 

Always start the machine after filling it with 
fluid, as explained under sections 
“Operation”. 

 

4.1 Start-up 

Perform the following operations to start the machine for the 
first time: 

Open the gate on the suction line 

Start the machine 

Slowly open the gate on the delivery line to avoid water 
hammering on the delivery line 

Adjust the thermal relay depending on the current absorbed 
by the motor 

Adjust the enabling and disabling pressure of the pressure 
switch that controls the operation of the machine 

 
 

4.2 Checking the frequency of starts and 
stops 

To check the frequency of starts and stops, perform the 
following operations: 

Check the operation of the machine for an hour 

- If the number of starts/stops is above 40, adjust the control 

equipment in order to reduce the frequency 

 
 

Danger 

 

For high temperature fluids it is necessary 
to allow the fluid contained in the machine 
to cool before loosening the screws that fix 
the machine to the pipes 

 
 

Warning 

 

Always check that the machine is filled. 
Never start the machine without fluid, as 
indicated under section “Operation”. 

 
 

5. MAINTENANCE 

 

5.1 Lubrication 

The gasket on the shaft is self-adjusting. The sealing surfaces 
are resistant to wear and are lubricated by the pumped fluid. 
The bearings of the machine are lubricated by the pumped 
fluid. 
The ball bearings of the motor are self-lubricated with grease 
resistant to heat. 
 

Warning 

 

If the machines are installed, used and 
serviced in accordance with the 
instructions and directions given in this 
manual, they do not require lubrication. 
Follow the instructions and directions 
given in this manual 

 

5.2 Temporary disabling 

 
To disable the machine for a long period of time, perform the 
following operations: 
- Cut the electric system off by using a cut-off switch 
- If ambient temperature falls below the freezing temperature of 

the pumped fluid, perform the following operations: 

A- If the whole system has to be disabled: 

-- Drain the system 

B- If it is not necessary to drain the whole system: 

-- Close the gates on the delivery and suction lines 
-- Allow all the fluid to de-flow from the drainage cap of the 

machine 

-- 

Store the drainage cap for future use without 
disassembling it from the machine 

 

Danger 

 

When using high temperature fluids, allow 
the fluid contained inside the machine to 
de-flow before removing the cap and 
draining the fluid  

 

Warning 

 

Before restarting the machine, fill it as 
indicated under sections “Operation”. 

 
 

5.3 Periodical inspection 

At regular intervals, perform the following inspections: 
- Hydraulic performances 
- Lack of fluid leaks 
- Motor overheating 
- Relay tripping time 
- Start-up frequency 
- Correct operation of automatic controls 
- Vibrations 
- Noise 

A- If check-ups do not reveal the presence of abnormal 

conditions, continue to use the machine until the next 
check-up 

Содержание Nocchi R2T

Страница 1: ...GB Use and maintenance manual F Manuel d utilisation et d entretien D Bedienungs und Wartungsanleitung E Manual de uso y manutenci n NL Handleiding voor gebruik en onderhound RUS Bycnherwbb gj ecnfyj...

Страница 2: ...iability 3 INSTALLATION Page 17 3 1 Lifting 3 1 1 Machine without any type of packing 3 1 2 Machine packed in a cardboard box 3 2 Transportation 3 3 Storage 3 3 1 Characteristics of the storage area 3...

Страница 3: ...ification data 1 3 Machine identification data Machine code R 2 T D 65 60 X 6 Circulating pump 2 two pole motor 4 four pole motor Coupling to standard motor Twin type Rated diameter of mouths Max head...

Страница 4: ...he property 1 6 Conventions 1 6 1 Terminological conventions The following conventions have been adopted throughout the manual Machine electropumps specified in section Product specifications Authoris...

Страница 5: ...Fax 050 70 31 37 1 11 How to use the documentation supplied Operators should carefully read the documentation supplied before performing any operation on the machine The documentation supplied should...

Страница 6: ...ace with a capacity above the weight of the machines stored Protection against accidental impacts 3 3 2 Environmental characteristics of the storage area The storage area should have the following env...

Страница 7: ...n a low position to avoid water entering the motor and the bearings See the following figure for reference R4T R2T R4TD R2TD Install the machine on horizontal or vertical pipes on the delivery and ret...

Страница 8: ...be performed by loosening the 1 8 cap on the pump housing Sometimes the air venting operation needs to be repeated several times to completely remove the noise originating from the presence of air in...

Страница 9: ...operation of the machine for an hour If the number of starts stops is above 40 adjust the control equipment in order to reduce the frequency Danger For high temperature fluids it is necessary to allow...

Страница 10: ...using the cut off switch Close the gates on the suction and delivery lines Loosen the screws that fix the terminal block cover Disconnect the wires from the terminal block Remove the supply cable from...

Страница 11: ...The line voltage has been interrupted 2 Burnt fuse 3 No conduction in the starter contacts or faulty coil 4 Burnt fuses in the auxiliary circuit E The machine flow rate is irregular 1 Air present in...

Страница 12: ...Dimensioni e pesi Dimensions and weights Dimensions and poids Abmessungen und Gewichte pag 75 Dimensiones y pesos Afmetingen en gewichten Prestazioni Performances Performances Leistungen pag 76 Presta...

Страница 13: ...5 4 0 4 2 RL4TD 40 30 2 x 0 25 2 x 0 37 1380 2840 2810 2 x 0 55 2 x 0 25 2 x 0 37 2 x 0 75 3 x 230 400 2 x 1 10 2 x 0 25 2 x 0 37 50 1380 1390 2810 2860 1380 1390 2 x 1 10 2 x 1 50 2 x 0 25 2 x 0 75 2...

Страница 14: ...120 RL2TD 50 180 RL4TD 65 30 RL4TD 65 60 RL2TD 65 120 RL2TD 65 180 RL4TD 80 30 RL4TD 80 60 RL2TD 80 120 RL2TD 80 180 RL4TD 100 30 RL4TD 100 60 RL2TD 100 120 80 130 100 14 4 68 343 411 250 281 101 180...

Страница 15: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 40 76...

Страница 16: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 50 77...

Страница 17: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 65 78...

Страница 18: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 80 79...

Страница 19: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 100 80...

Страница 20: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 40 81...

Страница 21: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 50 82...

Страница 22: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 65 83...

Страница 23: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 80 84...

Страница 24: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 100 85...

Отзывы: