background image

ENGLISH

You have purchased a product made by Pentair Jung Pum-

pen and with it, therefore, also excellent quality and service. 

Secure this service by carrying out the installation works 

in accordance with the instructions, so that our product 

can perform its task to your complete satisfaction. Please 

remember that damage caused by incorrect installation or 

handling will adversely affect the guarantee. 
This appliance can be used by children aged 8 years or over 

and by persons with limited physical, sensory or intellectual 

capabilities, or with limited experience and knowledge, pro-

vided that they are supervised or have been instructed in 

the safe use of the appliance and are aware of the dangers 

involved. Children must not be allowed to play with the ap-

pliance. Cleaning and user maintenance must not be carried 

out by children unless they are supervised.

Damage prevention in case of failure

Like any other electrical device, this product may fail due to a 
lack of mains voltage or a technical defect.
If damage (including consequential damage) can occur as a re-
sult of product failure, the following precautions can be taken 
at your discretion:

   

Installation of a water level dependent (under circumstan-

ces, mains-independent) alarm system, so that the alarm 
can be heard before damage occurs.

   

Inspection of the collecting tank/chamber for tightness up 

to the top edge before – or at the latest, during – installation 
or operation of the product.

   

Installation of backflow protection for drainage units that can 

be damaged by wastewater leakage upon product failure.

   

Installation of a further product that can compensate in 

case of failure of the other product (e.g. duplex unit).

   

Installation of an emergency power generator.

As these precautions serve to prevent or minimise conse-
quential damage upon product failure, they are to be strictly 
observed as the manufacturer’s guideline – in line with the 

standard DIN EN specifications as state of the art – when using 

the product (Higher Regional Court Frankfurt/Main, Ref.: 2 U 
205/11, 06/15/2012).

SAFETY INSTRUCTIONS

This instruction manual contains essential information that 
must be observed during installation, operation and servic-
ing. It is therefore important that the installer and the respon-
sible technician/operator read this instruction manual before 
the equipment is installed and put into operation. The manual 
must always be available at the location where the pump or the 
plant is installed. 
Failure to observe the safety instructions can lead to the loss 
of all indemnity.
In this instruction manual, safety information is distinctly la-
belled with particular symbols. Disregarding this information 
can be dangerous.

  General danger to people

  Warning of electrical voltage

NOTICE! 

Danger to equipment and operation 

Qualification and training of personnel

All personnel involved with the operation, servicing, inspection 

and  installation  of  the  equipment  must  be  suitably  qualified 

for this work and must have studied the instruction manual in 

depth to ensure that they are sufficiently conversant with its 

contents. The supervision, competence and areas of responsi-
bility of the personnel must be precisely regulated by the ope-
rator. If the personnel do not have the necessary skills, they 
must be instructed and trained accordingly.

Safety-conscious working

The safety instructions in this instruction manual, the existing 
national regulations regarding accident prevention, and any 
internal working, operating and safety regulations must be ad-
hered to.

Safety instructions for the operator/user

All legal regulations, local directives and safety regulations 
must be adhered to.
The possibility of danger due to electrical energy must be pre-
vented. 
Leakages of dangerous (e.g. explosive, toxic, hot) substances 
must be discharged such that no danger to people or the envi-
ronment occurs. Legal regulations must be observed.

Safety instructions for installation, inspection and mainte-
nance works

As a basic principle, works may only be carried out to the equip-
ment when it is shut down. Pumps or plant that convey harmful 
substances must be decontaminated.

All safety and protection components must be re-fitted and/or 

made operational immediately after the works have been com-
pleted. Their effectiveness must be checked before restarting, 
taking into account the current regulations and stipulations.

Unauthorised modifications, manufacture of spare parts

The equipment may only be modified or altered in agreement 

with the manufacturer. The use of original spare parts and 
accessories approved by the manufacturer is important for 
safety reasons. The use of other parts can result in liability for 
consequential damage being rescinded.

Unauthorised operating methods

The operational safety of the supplied equipment is only guar-
anteed if the equipment is used for its intended purpose. The 
limiting values given in the "Technical Data" section may not be 
exceeded under any circumstances.

Instructions regarding accident prevention 

Before commencing servicing or maintenance works, cordon 
off the working area and check that the lifting gear is in perfect 
condition.
Never work alone. Always wear a hard hat, safety glasses and 
safety shoes and, if necessary, a suitable safety belt. 
Before carrying out welding works or using electrical devices, 
check to ensure there is no danger of explosion.
People working in wastewater systems must be vaccinated 
against the pathogens that may be found there. For the sake of 
your health, be sure to pay meticulous attention to cleanliness 
wherever you are working.
Make sure that there are no toxic gases in the working area.
Observe the health and safety at work regulations and make 

sure that a first-aid kit is to hand.

In some cases, the pump and the pumping medium may be hot 
and could cause burns. 

3

Содержание Multistream 10/2 A1

Страница 1: ...4 B1 15 4 B3 25 4 B4 35 4 B4 25 4 C1 35 4 C1 10 2 A1 EX 15 2 A1 EX 25 2 A2 EX 35 2 A2 EX 25 2 B1 EX 35 2 B2 EX 10 4 B1 EX 15 4 B3 EX 25 4 B4 EX 35 4 B4 EX 25 4 C1 EX 35 4 C1 EX UC 25 4 C1 UC 35 2 B2 U...

Страница 2: ...el All personnel involved with the operation servicing inspection and installation of the equipment must be suitably qualified for this work and must have studied the instruction manual in depth to en...

Страница 3: ...lso be used Modes of operation with the pumped medium at a temperature of 40 C Motor submersed continuous operation S1 Motor emerged short duration operation S2 see Technical Data Motor emerged interm...

Страница 4: ...installed for facilities with protec tive earth conductors in TN TT networks in areas subject to explosion hazards In Germany for example the design must be in accordance with VDE 0100 Part 540 Assoc...

Страница 5: ...ck the mechanical seal the oil including any residue must be drained from the oil reservoir and collected in a clean measuring container If the oil is contaminated with water milky an oil change must...

Страница 6: ...parts of the impeller mounting 6 Grease the shaft cover on the inside NOTICE Do not use grease containing graphite such as Molykote 7 Fix all the parts of the impeller mounting in place and tight en...

Страница 7: ...T4 Gb Ex db IIB T4 Gb Ex db IIB T4 Gb P1 P2 kW 1 3 1 1 1 8 1 5 2 6 2 1 3 7 3 2 2 6 2 2 3 7 3 2 U V 3 PE x 400 3 PE x 400 3 PE x 400 3 PE x 400 3 PE x 400 3 PE x 400 f Hz 50 50 50 50 50 50 I A 2 7 3 2...

Страница 8: ...5 2 7 2 0 4 0 3 4 U V 3 PE x 460 3 PE x 460 3 PE x 460 3 PE x 460 3 PE x 460 f Hz 60 60 60 60 60 I A 4 1 6 1 2 7 4 0 6 6 cos phi 0 83 0 87 0 65 0 85 0 76 n min 1 3400 3400 1700 1700 1700 Leistungen Pe...

Страница 9: ...ing housing A1 JP47068 B1 JP47069 A2 B2 JP47070 B3 B4 C1 JP47071 Wellenabdeckung Shaft cover JP47043 Laufradbefestigung Impeller fixation JP47059 Laufrad Impeller 10 2 A1 JP47047 15 2 A1 JP47048 25 2...

Страница 10: ...r Hebewirkung Bestanden der mechanischen Festigkeit Bestanden GEF HRLICHE SUBSTANZEN NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 411 13 1612 EN 12050 1 2001 Lifting plant fo...

Страница 11: ...szem ly m szaki dokument ci IT Persona abilitata per la documentazione tecnica NL Bevoegd persoon voor technische documentatie PL Pe nomocnik ds dokumentacji technicznej RO Persoan autorizat pentru do...

Страница 12: ...12...

Страница 13: ...13...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16...

Страница 17: ...17...

Страница 18: ...18...

Страница 19: ...19...

Страница 20: ...20...

Страница 21: ......

Страница 22: ...Pump Technical Services Limited Pump House Unit 12 Bilton Road Industrial Estate Erith Kent DA8 2AN Tel 01322 357 080 Fax 01322 341 341 Email sales pts jung co uk...

Страница 23: ...EX 75 2 B5 EX 100 2 B5 EX 55 4 B6 75 4 B6 100 4 C2 55 4 B6 EX 75 4 B6 EX 100 4 C2 EX 55 4 C2 75 4 C2 100 4 C5 55 4 C2 EX 75 4 C2 EX 100 4 C5 EX 55 4 C5 75 4 C5 55 4 C5 EX 75 4 C5 EX 76 4 C5 76 4 C5 E...

Страница 24: ...2...

Страница 25: ...g of personnel All personnel involved with the operation servicing inspection and installation of the equipment must be suitably qualified for this work and must have studied the instruction manual in...

Страница 26: ...cal Data The submersible pump is frost resistant down to 20 C when stored in dry conditions When installed however it must not be allowed to freeze in the water Transport The pump must never be lifted...

Страница 27: ...ected to the chamber from the outside In this case an electrically conductive connection must be made be tween the conductive parts and the housing of the pump s For corrosion protection reasons the c...

Страница 28: ...tional liability the first oil change should be carried out after 300 operating hours with further oil changes carried out after every 1000 operating hours If the number of operating hours is very low...

Страница 29: ...using the cable entry point is opposite the discharge branch 10 Set the gap dimension to 0 5 0 8 mm and then tighten the impeller screw to 160 Nm WHAT TO DO IN THE EVENT OF ANY PROBLEMS Pump does not...

Страница 30: ...g set JP47137 Rotorwelle Rotor shaft JP47148 Lagerdeckel Bearing cover JP47155 lschraube Oil screw JP46046 Lagerkammer Bearing housing JP47162 Wellenabdeckung Shaft cover JP47181 Trennflansch Partitio...

Страница 31: ...Gleitringdichtung Mechanical seal JP46587 Gleitringdichtung Mechanical seal JP47140 Laufradbefestigung Impeller fixation B5 C5 55 4 C2 JP47182 B6 75 4 100 4 C2 JP47183 Laufrad Impeller 55 4 B6 JP4715...

Страница 32: ...tanden der Hebewirkung Bestanden der mechanischen Festigkeit Bestanden GEF HRLICHE SUBSTANZEN NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 412 13 1612 EN 12050 1 2001 Lifting...

Страница 33: ...entatie PL Pe nomocnik ds dokumentacji technicznej RO Persoan autorizat pentru documentatiei tehnice SK Opr vnen osoba pre technick dokument ciu SV Auktoriserad person f r teknisk dokumentation JUNG P...

Страница 34: ...12...

Страница 35: ...13...

Страница 36: ...14...

Страница 37: ...15...

Страница 38: ...16...

Страница 39: ...17...

Страница 40: ...18...

Страница 41: ...19...

Страница 42: ...20...

Страница 43: ...RISTIQUES TECHNIQUES DATI TECNICI DANE TECHNICZNE TECHNICK DAJE TECHNICK DAJE M SZAKI ADATOK DATE TEHNICE 55 2 B2 55 4 B6 55 4 C2 55 4 C5 kg 88 111 125 119 PN 6 10 DN 80 DN 100 DN 150 DN 100 mm 70 70...

Страница 44: ...ciclo 10 min Przyk adowo 40 4 min pracy i 6 min przerwy Czas cyklu 10 min P klad 40 4 min provoz a 6 min p est vka trv n pracovn ho cyklu 10 min Pr klad 40 4 min prev dzka a 6 min prest vka doba trvan...

Страница 45: ...2 41 17 75 4 C2 270 257 245 233 216 199 185 168 146 86 26 75 4 C5 212 204 195 187 178 169 160 148 138 99 61 22 76 4 C5 62 27 100 2 B5 190 188 184 182 177 174 169 164 159 144 129 113 97 79 63 47 32 18...

Страница 46: ...Pump Technical Services Limited Pump House Unit 12 Bilton Road Industrial Estate Erith Kent DA8 2AN Tel 01322 357 080 Fax 01322 341 341 Email sales pts jung co uk...

Страница 47: ...6 150 4 C3 EX 200 2 B6 EX 300 2 B6 EX 150 4 C6 230 4 C3 300 4 C4 150 4 C6 EX 230 4 C3 EX 300 4 C4 EX 151 4 C3 230 4 C6 300 4 C6 151 4 C3 EX 230 4 C6 EX 300 4 C6 EX 151 4 C6 230 4 C7 300 4 C7 151 4 C6...

Страница 48: ...2...

Страница 49: ...g of personnel All personnel involved with the operation servicing inspection and installation of the equipment must be suitably qualified for this work and must have studied the instruction manual in...

Страница 50: ...e of 40 C Motor submersed continuous operation S1 Motor emerged short duration operation S2 see Technical Data Motor emerged intermittent operation S3 see Technical Data The submersible pump is frost...

Страница 51: ...JUNG PUMPEN concrete or plastic chambers in explosion zones 1 and 2 statement made by T V Nord Technical Inspec tion Agency in March 2008 Exception if conductive parts such as cable protection sleeve...

Страница 52: ...months However if the oil is contaminated with both water and pol lutants then not only the oil must be replaced but the me chanical seal as well For monitoring the oil reservoir it is also possible t...

Страница 53: ...he compression piece into the impeller and assemble all parts of the impeller mounting 9 Slide the new impeller over the preassembled impeller mounting onto the shaft and tighten the impeller screw un...

Страница 54: ...7112 300 4 JP47113 Lagerdeckel Bearing cover JP47100 Lagersatz Bearing set 150 231 JP47108 300 JP47044 Lagerkammer Bearing housing 200 2 300 2 JP47128 150 4 300 4 JP47129 Laufradbefestigung Impeller f...

Страница 55: ...er Hebewirkung Bestanden der mechanischen Festigkeit Bestanden GEF HRLICHE SUBSTANZEN NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 413 13 1612 EN 12050 1 2001 Lifting plant f...

Страница 56: ...mocnik ds dokumentacji technicznej RO Persoan autorizat pentru documentatiei tehnice SK Opr vnen osoba pre technick dokument ciu SV Auktoriserad person f r teknisk dokumentation JUNG PUMPEN Stefan Sir...

Страница 57: ...11...

Страница 58: ...12...

Страница 59: ...13...

Страница 60: ...14...

Страница 61: ...15...

Страница 62: ...16...

Страница 63: ...17...

Страница 64: ...18...

Страница 65: ...ECHNISCHE DATEN TECHNICAL DATA CARACT RISTIQUES TECHNIQUES DATI TECNICI DANE TECHNICZNE TECHNICK DAJE TECHNICK DAJE M SZAKI ADATOK DATE TEHNICE 150 4 C3 150 4 C6 151 4 C3 151 4 C6 kg 268 247 269 247 P...

Страница 66: ...ATEX 1116 X ATEX 1116 X ATEX 1116 X ATEX 1116 X ATEX 1116 X II 2 G Ex d IIB T4 Ex d IIB T4 Ex d IIB T4 Ex d IIB T4 Ex d IIB T4 Ex d IIB T4 P1 kW 17 3 19 3 19 3 19 3 22 0 22 0 P2 kW 15 4 17 0 17 0 17 0...

Страница 67: ...00 290 280 270 260 246 231 200 164 126 80 40 14 151 4 C3 144 98 44 151 4 C6 133 81 44 10 230 4 C3 455 441 434 426 413 400 394 382 369 322 272 212 153 98 45 230 4 C6 405 400 391 383 371 360 344 332 321...

Страница 68: ...Pump Technical Services Limited Pump House Unit 12 Bilton Road Industrial Estate Erith Kent DA8 2AN Tel 01322 357 080 Fax 01322 341 341 Email sales pts jung co uk...

Отзывы: