Combustion Chamber Cleaning Procedure
29. Reconnect the Condensate drain to the neutralizer and/or drainpipe
30. Turn the manual gas shut off valve on.
Test for gas leaks. Verify the gas system is leak tight.
31. Operate the boiler
and check for smooth ignition and proper burner operation
32. Perform a combustion test.
Using an electronic combustion analyzer, verify the high fire CO2 reading equals the value in the table
below. Adjust if necessary. Refer to the boiler’s installation manual, section 5, for procedural information.
Boiler Model
Gas Type
CO
2
%
PCH 34B H
Nat
9.1
LPG
10.3
PCH 50B H
Nat
9.4
LPG
10.3
PCC 34 H
Nat
9.1
LPG
10.3
PCI 18/8 H &
PCH 18B H
Nat
9.3
LPG
10.1
PCI 34/20 H
Nat
9.1
LPG
10.3