2
2
Table of Contents
TABLE OF CONTENTS ..............................................................................................................2
INTRODUCTION: ........................................................................................................................3
TERMINOLOGY AND SYMBOLS MEANINGS: ....................................................................3
BASIC ROOM DIMENSIONS: ...................................................................................................3
DRAIN REQUIREMENTS: .........................................................................................................6
HOT AND COLD WATER SUPPLY REQUIREMENTS:.......................................................7
ELECTRICAL REQUIREMENTS: ............................................................................................7
UNPACKING THE TUB: .............................................................................................................7
UNPACKING THE RESERVOIR: .............................................................................................8
TUB MODIFICATIONS FOR RESERVOIR: ...........................................................................8
ASSEMBLING THE RESERVOIR: ...........................................................................................8
WATER SUPPLY HOSE CONNECTIONS: ..............................................................................9
ANCHORING THE TUB/RESERVOIR: ...................................................................................9
WATER SUPPLY AND DRAIN CONNECTIONS: ..................................................................9
ELECTRICAL CONNECTIONS: .............................................................................................10
FINISHING UP:...........................................................................................................................11
TUB AND RESERVOIR CONTROLS: ....................................................................................12