background image

LIT-12013314 

PC10

Johnson Controls
www.penncontrols.com
2020-03-03

PENN Connected PC10 Commissioning

Guide

Содержание Connected PC10

Страница 1: ...LIT 12013314 PC10 Johnson Controls www penncontrols com 2020 03 03 PENN Connected PC10 Commissioning Guide...

Страница 2: ......

Страница 3: ...nce 6 Installing the gateway 7 Installing the repeaters 8 Installing the temperature sensors 9 Installing the door sensors 10 Commissioning the gateway 11 Commissioning the sensors 12 Signing off 13 R...

Страница 4: ......

Страница 5: ...l probe internal and external temperature sensor Cable length 2 8 m NTC One for each refrigeration unit RMZ1214E61 DS1 Magnetic external door sensor with reed contact switch All One for each chiller o...

Страница 6: ...ateway and repeaters The presence of any structures or walls that may interfere with the signal strength of the hardware See the following figure and table for the typical layout of a site and its har...

Страница 7: ...ng locations for the hardware Mount the gateway and repeaters in an open enclosure in a safe and secure position The maximum range from a gateway to a sensor is 30 m 98 42 ft It is best practice to in...

Страница 8: ...Installation sequence About this task Install the hardware in the following sequence 1 Gateway 2 Repeaters 3 Temperature and door sensors PENN Connected PC10 Commissioning Guide 6...

Страница 9: ...blinks blue once every second The data light blinks red when the gateway connects to the global system for mobile communications GSM network The server light turns green when the gateway connects to t...

Страница 10: ...e wireless network 1 Identify the locations for the repeaters 2 Mount the repeaters with or without a bracket To secure the repeaters use screws tie wraps or double sided tape 3 Connect the repeaters...

Страница 11: ...nt a sensor with or without a bracket in each refrigeration unit that you want to monitor To secure the sensor use screws tie wraps or double sided tape 2 Attach a sticker to a visible location on the...

Страница 12: ...r freezer room door that you want to monitor To secure the sensor use screws tie wraps or double sided tape 2 Attach the magnetic strip to the frame of the chiller or freezer room door 3 Attach a stic...

Страница 13: ...sent by email 2 Commission the gateway in one of the following ways Locate the unique 15 or 16 digit serial number on the side of the gateway In the ICCID or IMEI field enter the serial number and ta...

Страница 14: ...or type from the available options and tap Register 4 In the Enter cabinet name field enter a name for the sensor 5 From the Select alarm configuration list select the appropriate alarm parameter from...

Страница 15: ...the commissioned units for the current site Sign off and view Submit the commissioned units for the current site and view them on the PENN Connected platform Sign off and add new Submit the commissio...

Страница 16: ...0 Temperature Sensor Catalog Page LIT 1901118 PENN Connected E11 Temperature Sensor Catalog Page LIT 1901119 PENN Connected R10 Repeater Catalog Page LIT 1901120 PENN Connected C20 Gateway Catalog Pag...

Страница 17: ...NO 32 CHANGJIJANG RD NEW DISTRICT WUXI JIANGSU PROVINCE 214028 CHINA JOHNSON CONTROLS WESTENDHOF 3 45143 ESSEN GERMANY JOHNSON CONTROLS 507 E MICHIGAN ST MILWAUKEE WI 53202 USA For more contact inform...

Страница 18: ...roduct or access to the cloud or hosted services applicable to this product if any is subject to applicable terms set forth at www johnsoncontrols com techterms Your use of this product constitutes an...

Страница 19: ...Product warranty This product is covered by a limited warranty details of which can be found at www johnsoncontrols com buildingswarranty 17 PENN Connected PC10 Commissioning Guide...

Страница 20: ...Patents Patents http jcipat com 2020 Johnson Controls All rights reserved All specifications and other information shown were current as of document revision and are subject to change without notice...

Отзывы: