background image

107077-001 - Product Manual - Model #1590 Axial Construction Heater / Blower - Rev. 05  - 07-01-2015

Page 10

21

18

19

17

20

11

44

56

4

81

82

74

104

99

97

98

80

95

22

54

16

24

34

61

32

60

59

62

65

58

40

4

44

57

25

20

13

21

19

23

65

31

16

22

28

56

43

9

26

29

37

6

5

10

42

30

7

15

14

12

Figure 3.1b:

 #1590

Parts Diagram

Figure 3.1c:

 #1590

Parts Diagram

3.1 Parts Diagram & List (continued)

Содержание 107077-001

Страница 1: ...ual Model 1590 Construction Heater Blower T A Pelsue Company 2500 South Tejon Street Englewood Colorado USA 80110 Tel 800 525 8460 or 303 936 7432 Fax 303 934 5581 Internet www pelsue com Email sales pelsue com ISO 9001 Certified ...

Страница 2: ...107077 001 Product Manual Model 1590 Axial Construction Heater Blower Rev 05 07 01 2015 Page 2 ...

Страница 3: ...ontinuing reputation for excellence in the production of fine products for a broad spectrum of industry throughout the world Now in our second generation of family direction continued commitment to innovation and qual ity makes Pelsue a leading source of equipment for many types of confined spaces We specialize in safety retrieval fall arrest ventilation cable placing splicing and maintenance nati...

Страница 4: ...1 2 Pelsue Product Warranty 2 0 Introduction Product Information 7 2 1 Serial Number 3 0 Configuration Assembly 8 3 1 Parts Diagram List 3 2 Wiring Diagram 4 0 Safety 13 4 1 Safety Alert Symbol 4 2 General Safety Information 5 0 Product Operation 15 5 1 Product Description Capabilities 5 2 Start Up Operating Procedures 6 0 Troubleshooting 18 7 0 Storage 18 8 0 Contact Information 19 ...

Страница 5: ...satisfaction is one of the differentiators that sets you apart from the pack and yields a competitive advantage Therefore we will support total customer satisfaction by implementing the ISO 9001 Quality System and providing the necessary atmosphere and training to nurture this concept throughout our organization We will make every business decisionas though the quality of the part or service provi...

Страница 6: ...ll be limited to the repair or replacement of the product or component as set forth above and shall not include any liability whatsoever for damages caused by such failure including but not limited to consequential or incidental dam ages flowing from use or lack of use of product Any replacement repair modification installation or other service performed by the T A Pelsue Company shall be warranti...

Страница 7: ...ions could result in serious injury or death 2 1 Serial Number Product Serial Number Always give your dealer the serial number of your Pelsue portable heater blower product when ordering parts or request ing service or other information The rating and serial number decal is permanently embossed with a serial number The serial number decal is located on the control box cover as shown in Fig 2a The ...

Страница 8: ...cements become necessary The parts list table displays applicable part num bers descriptions and quantity per assembly Replacement parts can be ordered from the T A Pelsue Company at 800 525 8460 3 1 Parts Diagram List Figure 3 1a 1590 Parts Diagram Table 3 1a 1590 Parts List ITem NumBer PArT NumBer DeSCrIPTION QuANTITy 3 115410 001 HOUSING SILkSCREENED 1 4 106942 001 HANDLE PULL TYPE BLk PLASTIC ...

Страница 9: ... 1 3 75866 81 3 7 385 6 Table 3 1a 1590 Parts List continued ITem NumBer PArT NumBer DeSCrIPTION QuANTITy 14 107299 001 FITTING ADAPTER 1 4 NPT HEx HD THRU HOLE 1 15 107572 001 COUPLER MERCHANT 1 4 NPSF THRU GALV 1 16 107166 001 BAFFLE MAIN BURNER 1 17 106860 001 GASkET SPARk IGNITER FLAME SENSOR 1 18 106031 001 SPARk IGNITER IGNITER FLAME SENSOR ELECTRODE 1 19 68N 002800 SCREW MACHINE PHIL TRUSS ...

Страница 10: ... 2015 Page 10 21 18 19 17 20 11 44 56 4 81 82 74 104 99 97 98 80 95 22 54 16 24 34 61 32 60 59 62 65 58 40 4 44 57 25 20 13 21 19 23 65 31 16 22 28 56 43 9 26 29 37 6 5 10 42 30 7 15 14 12 Figure 3 1b 1590 Parts Diagram Figure 3 1c 1590 Parts Diagram 3 1 Parts Diagram List continued ...

Страница 11: ...1 80 110007 001 CAPACITOR 7 5 MFD 370 VAC 60 Hz 1 81 110288 001 COVER RUBBER CAPACITOR CONNECTION 1 82 114628 001 CAPACITOR BRACkET 1 83 107602 001 SWITCH THERMAL CUT OFF OPEN 120 CLOSE 110 1 84 107076 001 FITTING MALE 1 4 MNPT x 1 4 COMPRESSION BRASS 4 85 107275 001 TUBE COPPER 1 4 OD x 4 75 LONG 1 86 107062 001 FITTING TEE 1 4 FNPT x 1 4 FNPT x 1 4 MNPT 1 87 107061 001 FITTING REDUCER BUSHING 3 ...

Страница 12: ...Axial Construction Heater Blower Rev 05 07 01 2015 Page 12 MOTOR 1 3 HP 120 VAC 60 HZ BUTT SPLICE 14 16 3X CAPACITOR 7 5 MFD 370 VAC 60 HZ PLUG 120 VAC 60 HZ BN BN BK WT BK WT GN GN 3 2 Wiring Diagram Figure 3 2a 1590 Motor Wiring Diagram ...

Страница 13: ...eople around you Make these practices a working part of your safety program Do not risk injury or death by ignoring good safety practices The most important safety device on this equipment is a safe operator It is the operator s responsibility to read and understand all of the safety and operating instructions in the manual and to follow them Most accidents can be avoided A person must understand ...

Страница 14: ...an over the heater during ignition or operation do not wear loose clothing that can become entan gled in operating machinery Do not operate the heater blower without inlet and outlet screen guards in place Do not place fingers or any other object through inlet or outlet screens 7 Do not move handle or service the unit while hot or burning Permanent skin tissue damage can occur if contact is made w...

Страница 15: ... operation if inlet or outlet are blocked Materials Construction Aluminum Base Housing Stainless Steel Heat Exchanger Stainless Steel Brass Copper Plumbing Additional Requirements Notes This heater is only intended for use in a well ventilated space and is not for home or recreational vehicle use Prior to Operation the 1590 Construction Heater should be configured and prepared according to the fol...

Страница 16: ... check for leaks NOTE The longer the fuel hose length the longer period of time to purge the hose of air from the initial hookup e IGNITION DO NOT STAND OVER THE HEATER OR LEAN OVER THE CHIMNEY Turn heater control switch to the on position There will be a 4 second delay prior to ignition once the switch has been turned on to facili tate a safety purge of the combustion chamber After this delay the...

Страница 17: ... safe condition When the ventilator is in use the air inside the confined space should be monitored continuously for the presence of poisonous gases and or toxic fumes Ensure that the blower provides positive airflow the entire time during usage The blower can be used with an acces sory Pelsue Air Flow Alarm 123717 001 in order to alert the entrants if positive ventilation is lost As shown in Figu...

Страница 18: ...uit board 3 Check to be sure blower is on otherwise replace pressure switch Burner lights for 3 4 seconds and then shuts off 1 Circuit board failure 2 Flame sensor failure 1 Replace circuit board 2 Replace flame sensor spark igniter unit Yellow flame 1 Dirty orifice s 1 Clean orifices Prior to storage the heater should be thoroughly inspected and maintained Repair or replace any worn or damaged co...

Страница 19: ...n Heater Blower Rev 05 07 01 2015 Page 19 8 0 Contact Information For More Information T A Pelsue Company 2500 S Tejon St Englewood CO 80110 Toll Free 1 800 525 8460 Telephone 1 303 936 7432 Fax 1 303 934 5581 Website www pelsue com Email sales pelsue com ...

Страница 20: ...ISO 9001 Certified T A Pelsue Company 2500 South Tejon Street Englewood Colorado USA 80110 Toll free 800 525 8460 or 303 936 7432 Fax 303 934 5581 Internet www pelsue com Email sales pelsue com ...

Отзывы: