Can
adian Comfort Industries V04
9
PELPRO OWNERS MANUAL
Copyright 2004
www.pelprostoves.com
Dansons Group Inc.
Window
Burn Pot
Burn Grate
Heat Tubes
Tube Scraper
E Z Clean
Grate
Hopper
Fan Motors
Auger
Exhaust
Air Intake
Auger Motor
Ash Pan
I
NSTALLATION
C
HECK
L
IST
Unless you are knowledgeable and experienced in stove installation, we recommend your
PELPRO
stove
receive a Pre-delivery Check and be installed by your local Specialty Retailer or Certified HVAC Service
Depot.
COMPLETE THIS CHECK LIST PRIOR TO LIGHTING YOUR FIRST FIRE:
_____ Carefully read this "Owner's Manual”
.
SAVE THIS MANUAL.
_____ Obtain final inspection
and approval by local building officials.
_____ Carefully
clean all marks off the brass parts
before the first fire is lit. Use a soft cloth and a gentle type
cleaner.
Caution
: Never use an abrasive cleaner on any part of your stove.
_____ Polish the hopper
to remove the oil type coating used in manufacturing.
_____ Have your local Dealer
demonstrate all the operational, cleaning and maintenance steps necessary
for your stove.
_____
Sign and keep a copy of the
Pre-delivery Check List supplied by your Authorized Pelpro Dealer,
“Dansons Certified Installer”, found inside our appliance or available online.
Register online at
www.dansons.com/support
for Extended Warranty.
______ Register your purchase online at www.dansons.com/support.
_____ Fill the hopper with quality pellets to prime the unit
; Using the CCI “AcuTron”, (figure 5), PUSH the
FEED RATE
Touch Pad and this will start the auger and the combustion fan.
NOTE:
Do not attempt to light a fire at this time. Leave the
START / FEED RATE [ON]
for 2 to 5 minutes until
pellets start dropping into the burn grate. Then touch the
OFF
pad to turn off system
. The auger is now primed to
deliver fuel to the burn grate (figure 6). Then light the stove according to the directions outlined in "LIGHTING
YOUR STOVE",
CCI –“AcuTron Board”
Cutaway View
Figure 3
Figure 4